My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5067
>
Resolutions
>
Resolution 5067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 9:35:50 AM
Creation date
2/23/2017 9:35:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5067
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 7 From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars _ Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road men/ Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MM/YY) <br /> 1 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 19 19 20 21 <br /> 19 10 2 phases in project 6 S 00 C PE 1/1/02 <br /> P CN 5/1/02 CDBG 360 360 60 60 60 180 No <br /> Neighborhood Block Grants T <br /> Various locations within City limits 0 <br /> Various streets to Various streets <br /> Construct public steels in various neighborhoods Totals 360 360 60 60 60 160 <br /> 19 11 2 phases in project 12 S 00 C PE 1/1/02 <br /> P CN 6/1/02 900 900 150 150 150 450 No <br /> Traffic Signal Improvements(City-wide) T <br /> Various locations within City limits <br /> Various streets to Various streets <br /> Design,construct,install traffic signals Totals 900 900 150 150 150 450 <br /> 19 12 2 phases in project 12 S 00 C PE 3/1/02 <br /> P CN 9/1/02 600 600 600 No <br /> Developer Traffic Signals T <br /> • Various locations within City limits <br /> Various streets to Various streets <br /> Design,cinstruct,install developer traffic signals . Totals _ 600 600 600 <br /> 19 13 3 phases in project 32 S 0.3 C PE 4/1/02 STPE 30 20 50 50 CE <br /> P RW 1/1/04 STPE 40 10 50 50 Yes <br /> Interurban Trail Completion T CN 6/1/04 STPE 200 50 250 250 5/1/04 <br /> Colby Avenue 0 <br /> 44th Street to 41st Street <br /> Design and construct bike&ped improvements Totals L 270 80 350 50 300 <br /> 19 14 1 phase in project 32 S 0.45 C PE 1/1/02 STP(E) 33 17 50 50 <br /> P No <br /> • <br /> 41st Street Connector•Design Study T <br /> 41st Street 1 0 <br /> Interurban Trail to Riverfront Parkway <br /> Design construct bike-ped trail connector Totals 33 50 <br /> 19 15 2 phases In project 12 S 0 0 PE 1/1/02 75 75 50 25 CE <br /> BNSF to do some of the work CN 6/1/02 STP(S) 475 475 175 300 No <br /> Railroad crossing safety improvements <br /> various locations <br /> various railroad crossings in Everett <br /> Design and construct railroad crossing improvem. Totals 550 550 225 325 _ <br /> 19 16 2 phases in project 01 P 0.3 C PE• 4/1/02 40 40 40 <br /> Port of Everett is Lead Agency P CN 8/1/03 160 160 160 No <br /> Terminal Avenue Improvements T <br /> Terminal Avenue 0 , <br /> California Street to Bond Street <br /> Design and construct street&ped improvements Totals 200 200 40 160 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.