My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program <br /> Agency Everett From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification , Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. j Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. (Federal Funding Local Agency _ <br /> C. Project Title R/W <br /> Func- I D. Street/County Road Name or Number :Improve'1 Phase ederal Federal' State 1 4th Required <br /> tional I Priority E. Beginning MP or road-Ending MP or road • ment I Total I Utility Project I Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class (!Number. F. Describe Work to be Done Type Status Length Codes Phase limm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 2 3 4 1 5 I 6 7 8 9 10 11 1 12 I 13 14 15 16 17 18 19 20 ' 21 <br /> 14 5 3 phases in project 4 S 0.6 ' C PE 9/1/00 !AIP 119 40, 159 159 <br /> P RW 10/1/00 255 85 340 340, Yes <br /> !Evergreen Way Widening T CN 7/1/01 900 300 1200 9001 300 <br /> Evergreen Way-Rucker Avenue 0 II <br /> 41st Street to 47th Street j <br /> I Design and construct widening from 5 to 7 lanes Totals I1274 4251 1699 1399 300 <br /> 14 6 1 2 phases in project 3 S 0.2 C PE 10/1/00 I TIA 45 22! 67 22 45 <br /> P CN 7/1/01 455 2281 683 683 No <br /> IBroadway/Beverly Blvd.Intersection Improv. T <br /> So.Broadway, Beverly Boulevard 0 I <br /> Broadway at Beverly to SR 526 <br /> (Design and construct intersection improvements Totals I 500 250 750 22 728 <br /> 14 7 I 1 phase in Project 31 P 0 PE 2/1/02 500 125 625 625 No <br /> Broadway Corridor Study <br /> IBroadway Corridor Study II II <br /> 141st Street to Beverly Boulevard <br /> Preliminary Urban Design Study and Environ.Review 1 Totals , 500. 125. 625 I 625 <br /> 14 8 I 1 phase in Project 31 P 0 PE 2/1/02 ' 100 100 100 <br /> I No <br /> Arterial Needs Studies ` <br /> Various Arterials within City Limits ! , I 1 <br /> N/A to N/A <br /> Study improvement needs-various classes of arterials Totals 100 100 100 <br /> 14 9 3 phases in Project 1 P 5 C PE 12/1/91 <br /> P RW , 9/1/95 Yes <br /> SR 525 Corridor Projects T CN 8/1/99 I 35,000: 35,000 10,000 25,000 EIS <br /> SR 525 Corridor Projects ! 0 I <br /> SR 526 to 1-5 , Sep-95 <br /> Roadway improvements,new interchange at SR 99 Totals 35,000 35,000 10,000 25,000 <br /> 14 10 2 phases in Project 6 S 3.6 C PE CE <br /> P CN 1/1/01 No <br /> Evergreen Way/SR 99 HOV Improvements T 9/1/02 CMAQ 481 75 556 100 456 <br /> Evergreen Way,SR 99 0 <br /> 47th Street to Airport Road <br /> Install HOV treatments at key intersections Totals 481 75 556 100 456' <br />
The URL can be used to link to this page
Your browser does not support the video tag.