SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 4
<br /> Agency Everett From 2001 to 2006
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency
<br /> C. Project Title R/W
<br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required
<br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class umber F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type;(MM/YY)
<br /> 1 2 3 4 i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 14 13 2 phases in project 6 S I 2.5 C PE 1/1/98
<br /> P CN 8/1/02 420 137 557 I 557 No
<br /> 19th Avenue SE(SR 527)HOV Treatments T
<br /> ,19th Avenue SE(SR 527) 0 1
<br /> El Capitan Way
<br /> 32nd Street SE !
<br /> Install HOV treatments at1 key intersections 1 Totals 420 137 557 I 557 I
<br /> 16 1 HP-1998(015) 3 phases in project 1 8 S 0.3 C PE 1/1/99 DEMO 1,280 320 1,600
<br /> P RW 9/30/99 DEMO 598' 52. 150 800 EA
<br /> 41st Street Overcrossing T CN 4/1/01 DEMO 4,015' 1,048 3,060i 8,123 8,123 Yes
<br /> 41st Street 0 CN STP(U) 1,577 1,900 I 3,477 I 3,477
<br /> II-5 interchange to Landfill siteS _ 6/1/00
<br /> I Design and construct railway overcrossing �'. I W Totals 7,470 3,000. 3,530'.14,000 8,123', 3,4771
<br /> 16 I 2 2 phases in project 1 S 1.1 S PE 1/1/99 1,000 1,000 1 1,000
<br /> P CN 6/1/03 3,300 3,000 6,300 6,300 EA No
<br /> Riverfront Parkway
<br /> Riverfront Parkway
<br /> 41st Street to Lowell River Road I
<br /> Construct new minor arterial street Totals 4,300' 3,000 7,300 1,000 6,300
<br /> 16 3 2 phases in project 4 S 0.5 C PE 2/1/00 247 130 377 377
<br /> P CN 6/1/01 513 2,010 2523 2,523 No
<br /> 112th Street SW Improvements T
<br /> 112th Street SW 0 '
<br /> Airport Road to Evergreen Way(SR 99) S
<br /> Design,construct 5 lane street with bike&ped improv. W Totals 760 2,140 2900 2900
<br /> 16 4 3 phases in project 4 S 1.1 C PE 6/1/96 525 787 1312
<br /> Joint project with Sno.County-(county lead) P RW 1/1/97 1,408 2,111 3,519 Yes
<br /> 112th Street SW-SE Improvements T CN 5/1/01 TIA 2,011 3,019 5,030 5,030
<br /> 112th Street SW-SE 0 I
<br /> Evergreen Way(SR 99) to 3rd Avenue SE S
<br /> Design,construct 5 lane street with bike&ped improv. W Totals 3944 5917 9861 5,030
<br /> 16 5 3 phases in project 4 S 1 C PE 1/1/01 600 600 1,200 1,200
<br /> P RW 5/1/01 1,000 1,000 2,000 1,500 500 Yes
<br /> 112th Street SE Improvements T CN 5/1/02 TIA 5,000 5,000 10,000 5,000 5,000
<br /> 112th Street SE 0
<br /> 3rd Avenue SE to 19th Avenue SE(SR 527) S
<br /> Design.construct 5 lane street with bike&ped improv. W Totals 6,600 6,600 13,200 2,700 5,500 5,000
<br />
|