My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 5 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> ' C. Project TitleR/W <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State • 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 19 _ 20 21 <br /> 16 6 1 phase in project • 4 P 1 C PE 2/1/02 200 200 200• <br /> - <br /> PI No <br /> 100th Street SW Improvements T <br /> 11 <br /> 100th Street SW 0 <br /> • ' T <br /> 11 Road to Evergreen Way <br /> Design,construct road widening&other improvements Totals 1 200 200 200 <br /> 17 1 3 phases in project 1 5 i P 1 C PE 8/1/02 <br /> P RW 1 5/1/03 ' Yes <br /> 36th Street Park&Ride Lot and Access Improv. T CN 3/1/04 112,0001 3,000 15,000 750 1,250 13,000 <br /> .36th Street,Broadway,and 41st Street 0 <br /> Street to 1-5 • <br /> 'Sm <br /> De Ign and construct Park and Ride Lot Access Totals 12 000;13,000 15000 750' 1,250 13,000 <br /> 17 I 2 3 phases in project 8 i S 0.2 C PE 7/1/99 Discret.• 650'.FM- 1 I 650 EA ' <br /> P RW ' 8/1/00 STP(U) 8651SIB I 317' 1182 • Yes <br /> I <br /> ,California Street Overcrossing I II T CN 12/1/00 STP(U) 802'TPP 4,684.2,182', 7668 8,000 <br /> • <br /> ;California Street 1 ' 0 <br /> West Marine View Drive to Terminal Avenue , <br /> Design and construct Arterial Overcrossing , 1 Totals • 2317 5001 i 2,182 9500 8,000; <br /> 17 3 3 phases in project • 5 S 0.3 C PE 6/1/00 15 7 22 22', , <br /> P RW 12/1/00 50 50 50 Yes <br /> 52nd Street Improvements T CN 5/1/01 AIP 262 112 374 374 <br /> .52nd Street 0 5/1/01 <br /> 'Colby Avenue to Claremont Avenue <br /> Design,construct widening&ped improvements Totals 277 169 446 446' <br /> 17 4 2 phases in project <br /> 8 P 0.2 C PE 1/1/03 No <br /> Everett Ave.BNSF Overcrossing-Railway Ave. P CN 1/1/04 3,000 600 3,600 3,600 <br /> Everett Evenue T <br /> East Grand Avenue to Railway Avenue 0 <br /> Design and construct arterial overcrossing Totals 3,000 600 3,600 3,600 <br /> 17 5 2 phases in project 5 P 0.1 C PE 1/1/02 <br /> P CN 4/1/02 200 40 240 240 No <br /> 16th Street Improvements T <br /> 16th Street 0 <br /> Maple Street to Walnut Street <br /> Design.construct road widening,intersection improv. Totals 200 40 240 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.