Laserfiche WebLink
Washington State Department of Transportation Page 5A Six Year Transportation Improvement Program <br /> Agency Everett From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars <br /> A. Federal Aid No. Fund Source Information <br /> B Bridge No. 1 Federal Funding <br /> C. Project Title ' <br /> Func- D Street/County Road Name or Number Improve- Phase I Federal Federal State <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total <br /> Class Number F. Describe Work to be Done Type Status Length ' Codes Phase (mm/dd/yy Code Phase Code Funds Funds Funds <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 <br /> 17 6 2 phases in project 5 P 0.1 C PE 6/1/02 <br /> P CN 6/1/03 AIP 300 50 350 <br /> 37th Street Improvements T <br /> 37th Street ImprovementsO <br /> Rucker Avenue to Wetmore Avenue 1 I <br /> Design,construct road widening,intersec.impr. Totals 300! 50 350 <br /> 17 7 2 phases in project 32 S 1.2 C PE 6/1/01 <br /> P CN 6/1102 PSMP 300 66 366 <br /> Holly Drive Pedestrian Improvements T <br /> Holly Drive Pedestrian Improvements 0 <br /> 100th Street SW to Airport Road <br /> Design and construct pedestrian improvements i Totals 300' 66 366 <br /> 17 8 2 phases in project 5 P 1.5 P PE 1/1/04 <br /> T CN 5/1/05 75 425 <br /> Smith Island roadway improvements <br /> ,various arterials on Smith Island <br /> !various <br /> Design and construct improvements , 75 425 <br />