Laserfiche WebLink
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 6 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No, 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. ;Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. I i !Federal Funding Local Agency <br /> R/W <br /> Federal State , ' <br /> tional PriorityE. Beginning MP or road-EndingMP or road ment Total Utility Project Start iFund'Federal Cost byF nd State I 4th Required <br /> C. Project Title <br /> Func- D. Street/County Road Name or Number Improve Phase ~ <br /> 9 9 Local Total 1st 2nd I 3rd thru Envir. Date <br /> Class ,Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 I 2 - 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 191 4 phases in project 32 : S � 00 C PE 3/1/98 CE <br /> P RW 9/1/99 Yes <br /> Northern Extension Interurban Trail,Stage II T CN 6/1/00 CMAQ 400 170 570 570 <br /> (Commercial Ave.,PUD R/W,Colby Avenue 0 CN 6/1/00 STP(E) 310 45 355 355 I 3/1/99 <br /> Madison Street to 41st Street _ <br /> !Design and Construct Pedestrian-Bicycle Path Totals 1 710 215 925 925 <br /> 19 2 I 2 phases in project 7 S 00 0 PE 1/1/00 <br /> 1 CN 7/1/00 STP(U) 270 10,500 10,770 1,7351 1,835' 1,9001 3,800 CE No <br /> Annual Street Overlay Program , <br /> Various streets within City limits i <br /> Various streets to various streets <br /> Resurfacing streets Totals 270 10,5001 10,770 1,735 1,835 1,900 3,800 <br /> 19 3 2 phases in project 6 S 00 C PE 1/1/00 <br /> P CN 5/1/00 2,400 2,400 400 400 400 800 No <br /> Neighborhood Traffic Mitigation Projects T <br /> Various locations within City limits 0 I I I <br /> Various streets to Various streets <br /> Install traffic enhancements in Neighborhoods Totals - 2,400 2,400 400' 4001 4001 800 I <br /> 19 4 2 phases in project 6 P 00 0 PE 1/1/01 I <br /> CN 5/1/01 1 360 360 60 60 601 180 I No <br /> Pedestrian Improvements (City-wide) <br /> Various locations within City limits <br /> Various streets to Various streets <br /> Design,construct new and rehab.Existing sidewalks Totals 360 360 60 60 60 180 <br /> 19 5 2 phases in project 6 S 00 C PE 1/1/01 <br /> P CN 5/1/01 CDBG 360 360 60 60 60 180 No <br /> Neighborhood Block Grants T <br /> Various locations within City limits 0 j <br /> Various streets to Various streets <br /> Construct public streets in various neighborhoods Totals 360 360 60 60 60 180 <br /> 19 6 1 phase in project 12 S 00 C CN 5/1/01 240 240 40 40 40 120 <br /> P No <br /> Traffic Signal Interconnect T <br /> Various locations within City limits <br /> Various streets to Various streets <br /> Construct traffic signal interconnect Totals 240 240 40 40 40 120 <br />