My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 7 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> B. Bridge No. I Federal Funding Local Agency 1 <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> C. Project Title _ RNV <br /> Func- l D. Street/County Road Name or Number Improve j Phase Federal Federal State I 4th Required <br /> tional 1 Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start ! Fund Cost by Fund State Local Total 1st I 2nd I 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status i Length!Codes Phase (mm/dd/yy) Code Phase Code !Funds Funds Funds ! j 6th Type !(MM/YY) <br /> 1 2 3 4 5 6 I T 8— - ---9 10 11 12 13 14 15 16 ! 17 i 18 1 19 20 l 21 <br /> 19 7 ! 2 phases in project 12 S 00 ; 0 PE 1/1/01 1 <br /> CN 5/1/01 1 2001 200 50 50 50 50 No <br /> Pavement Marking Project <br /> Various locations within City limits ! <br /> Various streets to Various streets ! <br /> ,Install pavement markings in various locations 1 Totals 200 200 50 50 501 50 <br /> 19 8 2 phases in project 12 S 00 C PE 1/1/01 <br /> ' P CN 6/1/01 I900 900 150 150 150' 450 No <br /> Traffic Signal Improvements(City-wide) T I , <br /> Various locations within City limits <br /> Various streets to Various streets <br /> jDesign,construct,install traffic signals Totals 900 900 150 150 150 450 <br /> 19 9 2 phases in project 12 S 00 C PE 3/1/01 ' <br /> P CN 9/1/01 600 600 600 No <br /> Developer Traffic Signals T <br /> Various locations within City limits <br /> !Various streets to Various streets <br /> 'Design,cinstruct,install developer traffic signals Totals 600 600 600 <br /> 19 10 2 phases in project 12 S 00 C PE 7/1/00 STP(S) CE <br /> P CN 3/1/01 STP(S) 261 29 290 290 No <br /> Hazard Elimination and Safety(HES)Projects T ! <br /> Ev.Mall Way,Broadway,Colby 0 <br /> Ev.Mall <br /> Way,Broadway,Colby to <br /> various streets <br /> Construct Hazard Elimination and SafetyrojTotals <br /> 261 29 290 290, <br /> 19 11 1 phase in project 12 P 00 C CN 120 120 20 20 20 60 <br /> P No <br /> Roadway Hazard Elimination Projects-city-wide T <br /> Various locations within City limits 0 I <br /> Various streets to Various streets <br /> Remove and/or modify roadside hazards Totals i 120 120 201 201 20! 60 <br /> 19 12 1 phase in project 31 P 00 PE 6/1/01 70 70 701 <br /> I No <br /> Neighborhood Traffic Studies ' ! <br /> Port Gardner,Northwest,and other neighborhoods <br /> Various streets to Various streets <br /> Study traffic trends&recommend improvements Totals 70 70 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.