Laserfiche WebLink
6 - I <br /> TIC I - <br /> T March 24, 2006 <br /> ANK <br /> INDUSTRY <br /> CONSULTANTS Mr. Jim Ozanne <br /> INC. City of Everett <br /> 7740 West New York Street 3200 Cedar Street <br /> Indianapolis, Indiana 46214 Everett, Washington 98201-4516 <br /> 317/271-3100-Phone <br /> 317/271-3300-FAX RE: Casino Tank Project <br /> Dear Mr. Ozanne: <br /> It is with great pleasure that I submit the enclosed Proposal for Tank <br /> Engineering Services to the City of Everett for approval. <br /> Bolingbrook, Illinois <br /> 630/226-0745 Tank Industry Consultants began providing tank engineering services <br /> Houston,Texas for the City of Everett in 1997. Since that time,TIC and the City have <br /> 281/367-3511 established an excellent working relationship through our many <br /> projects. TIC has evaluated the City's water storage tanks,performed <br /> Richmond,Virginia seismic analyses, provided detailed technical specifications, and <br /> 804/897-7176 provided construction phase services for rehabilitation of a number of <br /> the tanks. <br /> The Scope of Work by the TIC Team,which includes our <br /> knowledgeable and experienced subconsultants, addresses the <br /> engineering, inspection and project management services for the <br /> numerous upgrades to the Casino facilities. This complex project <br /> involves construction of two new elevated composite tanks and <br /> associated structural,electrical, instrumentation,mechanical and <br /> pumping improvements to the pump station,demolition of the existing <br /> standpipe and related improvements to the site and landscaping. The <br /> Scope of Work also includes testing, start-up and operational <br /> assistance to bring the improvements on line <br /> The following is a synopsis of the many successful projects that TIC <br /> and the City of Everett have accomplished together. <br /> Casino New Tanks and Facility Upgrades <br /> • Site Study <br /> • Tank Style Analysis <br /> • Participation in Communication Meetings and <br /> Communications <br /> Design and Specifications for the Fabrication and Erection of Two <br /> 2,000,000 Gallon Composite Elevated Tanks Including Foundation, <br /> 1 6 An Employee-Owned Company <br />