My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/05/17 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/05/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 11:45:34 AM
Creation date
2/24/2017 11:44:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-3 <br /> SCOPE OF WORK <br /> Task 4. Surveying and Mapping <br /> Provide surveying and preparation of base maps for temporary staging and/or permanent <br /> easement area located outside the limits of the previously surveyed area for the Phase 6 project. <br /> The areas to be surveyed and mapped will include the following: <br /> • East end of the Phase 6 project immediately south of the south boundary of <br /> the City's existing 100 ft easement near Home Acres Road. The area may <br /> extend up to 2 acres in size. <br /> The surveying and mapping work will include the following: <br /> A. Horizontal and Vertical Control. Provide horizontal and vertical control for Phase 6 survey <br /> work including meeting with City Surveyor prior to beginning work to discuss survey <br /> control and obtain City field books. Prepare control survey worksheet. Use City of Everett <br /> project control for establishing both vertical and horizontal datum. The vertical datum will <br /> be City of Everett NAVD 88 and based on existing benchmark monuments. Project <br /> coordinates will be assumed 10,000 / 10,000 assigned to one point in the project and the <br /> basis of bearings will be the City of Everett WSPCS North Zone, NAD 83/91. These points <br /> and the entire project will be referenced by conversion table to the City of Everett WSPCS <br /> North Zone, NAD 83/91 referenced to at least two(2) of the nearest available City geodetic <br /> control monuments as directed in the City's "Surveying and CAD Standards" unless <br /> provided otherwise by the City staff. <br /> B. Supplemental Ground Field Surveying. Conduct supplemental topographic/location <br /> surveys within the temporary construction staging area. Ground surveys for Phase 6 will <br /> be limited to the proposed temporary staging area. The survey work will locate visible <br /> above ground features such as: roadways, fences, driveways, ditches, utilities including <br /> inverts, and significant trees (as defined by Snohomish County). Locate wetland flags, and <br /> ordinary high water marks. This work will also include: <br /> • Conduct utility research. (Note: the City is to provide research documents and <br /> locate services for any City owned utilities, which primarily involves the <br /> water transmission pipelines and appurtenances). <br /> • Analyze City provided Title Reports, calculate approximate (+/- 2 ft) property <br /> boundaries and easements (maximum of two parcels for Phase 6). <br /> C. Engineering Base Map. Merge existing aerial mapping (completed previously by Perteet <br /> Engineering) with ground survey data and prepare engineering base map to City standards <br /> in AutoCAD 2000 to produce a 1' contour interval topographic base map of the temporary <br /> construction staging area. Add the City nomenclature for water, sewer & storm drainage <br /> structures to the point descriptions for existing City owned structures. <br /> 44 <br /> MWH Page 4 EVERETT PHASE 6 HDD PROJECT <br /> 5/1/06 EXHIBIT A-3-SCOPE OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.