My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1808 MERRILL CREEK PKY 2016-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1808
>
1808 MERRILL CREEK PKY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 9:17:22 PM
Creation date
2/25/2017 9:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1808
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
detention capacity in the regional detention facility is provided in our letter to Gordon <br /> Witcher dated 9/26/96 (See Appendix). The impervious area on the Frito-Lay site (3.19 <br /> acres) is less than the impervious area anticipated in the preliminary Frito-Lay site plan <br /> used in tlie 9%:6/96 summary (6.09 acres). This has occurred because Frito-Lay has <br /> chosen not to pave the south 155 feet of the site and not to build/pave for 150 feet east of <br /> the proposed building. When Frito-Lay completes the southerly parking area and rhe <br /> easterly building/parking, the impervious area wi��be increased by 2.16 acres for a total of <br /> 535 acres which is less ti�an the initially anticipated impervious area of 6.09 acres. <br /> Therefore, no additional detention or water quality facilities will be required at that time. <br /> The entry road n►�off, aPProximately 0.29 acres, will not be conveyed through the <br /> tightline system to the regional detention facility, due to topographic constraints. The <br /> �� runoff wi11 be collected in a catch basin with an oiVwater separator elbow. The runoff wi1� <br /> � then be conveyed under the north access of the Viking site and will outfall into Mercill <br /> � Creek upstream of the existing flume. <br /> � <br /> 4 I �� ' L� <br /> � � 4 <br /> w � Q <br /> � N � � � <br /> � � <br /> . <br /> rsm sr sr _ <br /> r---- �3 sr <br /> � � > <br /> � ����� eom sr sw <br /> ruxr <br /> -� NMSiSI � �{ <br /> � <br /> M � <br /> ^ � II <br /> PAMC��Ef11 <br /> Q'O <br /> r VICINITY MAP <br /> NTS <br /> w gTpRM DRAINAGE REPORT FOR FRITO-LAY PAGG 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.