Laserfiche WebLink
28. The City of Everett prohibits outdoor buming. Therefore, outdoor buming for the purpose of <br /> disposing of construcuon debris or rubbish w�ll not be permitted. <br /> 29. PREMISE IDF.NTIFICATION AND ALL REQUIRED FIRE DEPARTMENT ACCESS <br /> ROADS AND FIRE HYDRANTS SHALL BE IN SERVICE PRIOR TO <br /> COMMENCEMENT OF CONSTRUCTION. <br /> 30. Fire safety practices during construction must be in compliance with the Uniform Fire Code, <br /> Article 87, "Fire Safety Durmg Construction." <br /> 31. Any security fence erected around the construction site must be located so as to not ubstruct any <br /> esisting hydrant, tire protection equipment,or Fire Department access. If Fire Department access <br /> is obstructed, gates or other openings shall be provided for access. <br /> 32. In order to expedite plan review, a hazardous materials inventory list shall be provided as a part of <br /> the submittal for buildmg pertnit. The storage, handling and use of hazardou� materials must be in <br /> compliance with Article 80 of the Uniform Fire Code, 1991 Edition. <br /> The storage,handling and use of flammable or combustible liquids shall compl}• �cith Artide 79 oC <br /> the Uniform Fire Code, 1991 Edition. <br /> Please call 259-8726 for further information on any of the above items. <br /> 33. Stormwater quality protection and treatment requirements for each phase of this project shall be <br /> those requirements tn effect at the time of application for Public Works permits. Currently, three <br /> options for stormwater treatment are presented in the current Ciry standazds. The least preferred <br /> option is allowed only if the first two options are infezsible in the opinion of the Public Works <br /> Department. The options for sturmwater treatment are, in order of preference: <br /> 1) an infiltration basin designed and constricted according to City standards if suitable soils exist <br /> on the site. <br /> 2) a�vetpond designed and constructed to City standards. <br /> 3) a baffle-type oil/water separator followed by a vegetated swale, both designed and constructed <br /> according to Ciry standazds <br /> The presence of wetlands on/adjacent to this site indicate that the soils may not be suitable for an <br /> infiltration basin. If an infiltration basin is not feasible,a wetpond will be required. <br /> 34. Dumpsters over 1.5 cubic yards capacity must be located a minimum of 5 feet from the building <br /> (UFC 11.302(b), 1991 Edition) <br /> 35. The Washington State Clean Air Act requires the use of all l:nown, available, and reasonable <br /> means of controlling air pollution, including dust. Dust generated during construction activities <br /> can be controlled by wetting those dust sources such as areas of exposed soils, washing truck <br /> �vheels before they leave the site, and installing and maintaining gravel construction entrances. <br /> Construction vehicle track-out is also a major dust source. Any evidence of track-out can trigger <br /> violations and fines from th�. DepaRment of Ecoloey or the Puget Sound Air Pollution Control <br /> Agency. <br /> 9 <br />