My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—•--'"OCT.23.1997 16:06RM WSH PRCIFIC N0.944 P.4i6 <br /> N1r.Wayne M, Wenrc � <br /> Page 3 <br /> October 22, 1997 / /� � <br /> / / <br /> 1'� Uaita Dail . AM Ahs PM PM Fee Gl� <br /> LandUsc Y �Peak �-1 <br /> :ode (fimployees) Peak Peuk Pa}: <br /> Inbound Outb und 2 bound 04tbo d, ` � F;Y• <br /> ,.; •�+,w�� � , w '";:��s°�-"^,��'��" :�. � �,op6���d ' <br /> , � , . <br /> ' '�"I.iT: �3��`c s�''.h. k, ,� ' "� � <br /> � <br /> hase 1 Shift 1 167 558 62 9 <br /> 16 61 � <br /> iniHal) 52 g / � <br /> }tnse 1 Shift 3• 140 4�8 /-r , <br /> � <br /> iaitinl) 6R 9 ; 5137,822 <br /> Phase 1 307 1,025 62 9 <br /> hese 1 ShiR 1 <br /> y�Z y741 83 12 21 81 <br /> °° '� 52 8 <br /> hase 1 Shift 3' 140 468 <br /> avg.) 1,209 83 12 73 89 f162,972 <br /> VERpGE Pbnse 1 362 <br /> hase Z Shift 1 480 1,603 180 27 A6 1�4 <br /> �x'� 116 17 <br /> hase 2 ShiR 3• 310 1,035 <br /> maxJ <br /> �gp 2,639 160 27 162 191 5355,118 <br /> OTAL <br /> • Shifts 2 and 4 fall outside of the PM p <br /> eak travcl rime,PM Peak valua for Shift 3 based on AM B��pon nus to <br /> nccount for incoming volume. <br /> The range of PM peak trips estimated to be pmduced by the site in the hour of overlap betweea fiist <br /> and second shifts in Phase 1,or 137 trips,while tha maximum is 353 (the period where fust, third <br /> and office siv8s overlap),with a��.�verage of 162. <br /> The site plan proposes 668 pa�'king stalls, including 621 standazd scalls, 35 compact and 12 <br /> handicapped stalls for employees and visitots. 'Ihe applicant, because of the number of employces, <br /> will be required to implement EveretYs commute trip redu�ti on ordinance,with a target of reducing <br /> single occupant vehicle trips by 35% over a five to seven yeaz period. Under the maximum <br /> employment scenario,the applicant will need to pursue an ag��essive trip reduclion progam in order <br /> to ensure that pazlcing overflow does not occur. <br />
The URL can be used to link to this page
Your browser does not support the video tag.