Laserfiche WebLink
04/14/04 07:16 FAX 4253476588 _Cn0,4 FVERFTr012/032 <br />00-02-20 <br />Cientn is Inve.cti ntinn mid (ieoterhnirnl Is"On ermg RMOrt <br />NF. Corner 35 ' SI. and Nassau St. <br />Evcren, lyashinglou <br />Due to the sensitivity of the uncontrolled till slopes, the proximity of the residence to the north of the site <br />and the possibility that uncontrolled fill extends into the City of I?verctt Right -of -Way, we recommend <br />that site preparation be observed on a twice daily basis by GF.S, Inc. - until material stability <br />characteristics and excavation safety can be reasonably discerned. Excavation should proceed until <br />bearing soil are exposed and confirmed by GES, Inc. Bearing soil consists of medium dense, damp to <br />moist, gray brown, very fine- to fine-grained sandy silt to silt with discontinuous lenses of very fine- <br />grained sand. This soil should be confirmed by GES, Inc. prior to placement of any structural fill/baekfill <br />to reach required site grades or before and foundation forms are set as per the recommendations contained <br />in section 4.3 of this report. <br />The surlicial soil found within the majority of the building envelope consists of uncontrolled fill with <br />significant amounts of deleterious materials (refer to the test pit logs contained in Appendix D of this <br />report). In our opinion, these uncontrolled soils and materials are not suitable for use beneath a <br />residential structure — we would therefore recommend that they be removed from within the proposed <br />building envelope. Given site grades and the proposed site development, the materials removed during <br />initial site clearing and grading will not be suitable fix placement elsewhere on site and should be <br />aispos deof at a permitted site or licensed recychn�c1, a recommend that a copy of the site fill <br />permit of facifi Icense 1c supp re to the owner print to allowing the contractor to take any materials off <br />site to a disposal facility. <br />Excavation and/or grading should be accomplished in such a manner as to allow continued and controlled <br />drainage throughout the site. Unchained water left standing upon exposed soil will cause them to become <br />moisture disturbed. Please refer to Section 4.1 of this report if concerns arise about moisture disturbed <br />soils, Uncontrolled run-otl' over the slope along the back of the lot could result in excessive erosion of <br />soil and/or local destabilization of the slope. Frosion control and drainage controls should be installed <br />following the recommendations contained in section 4.9 of this report. If conditions develop during the <br />initial stages of site work that cause concern to the owner or the contractor, work should be stopped and <br />GES, Inc. should be contacted to view the area of concern and develop recommendations specifically <br />designed to remedy the area of concei n. once the issues of concern have been addressed by GES, Inc. -- <br />site preparation may continue <br />9 GES, Inc. <br />