Laserfiche WebLink
1. The buildings must be constructed per the site plan and elevations on file at the Planning/Community <br /> Development Depaztment. Any changes to ihese plans will require Planning Director approval. <br /> 2. Final design and construction of the project shall comply with all requirements of SEPA MDNS #06-002. <br /> If a complete application has not bccn filed tor a building permit or equivalent construcHon permit <br /> wit6in cightcen (IS) months from t6c approval date of t6is decision, the permit shall be deemed <br /> terroinated, unless an extension is grantcd. If the permittec requcsts An eatension in writing not later <br /> than cighteen (18) monfhs trom thc land usc permit datc, the Director may grant a siz(�month ez <br /> T6is is an administrative decision that may be appealed to thc City's Land Use Hearing Examiner. An <br /> appeal must be filed with thc City wit6in 14 days of thc datc of this notice. If you have quesHons <br /> regarding this proposal or if you wish to file an appeal, plcase contact Dave Tyler,City of Everett <br /> Planning Departmcnt, at(425) 257-8731. <br /> Allan Giffcn, Director <br /> Planning:u�d Community Deve opment Department <br /> EXHIBIT #�_ <br /> PAGE 13 nF� �.��_ , <br />