My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page ] 0 of 46 <br />S4. MONITORIN� REQUIREMENTS <br />The primary monitoring requirements are summarized in Table 3(below): <br />Table 3. Summary of Monitoring Requirementsl <br />Size of Soil Disturbance Weel:ly Weekly Weekly Weekly <br />Site Sampling w/ Sampling w/ pH <br />Inspections Turbidity Meter Transpazency sampling� <br />Tube <br />Sites which disturb less than t Required Not Required Not Required Not <br />acre Re uired <br />Sites which disturb 1 acre or Re uired Sampling Required — either <br />more, but less than 5 acres q method� Required <br />Sites which disturb 5 acres or Requircd Required Not Requireds Required <br />more <br />A. Site Loe Book <br />The Pcrmittee shall maintain a site log book that contains a record of the <br />implementation of the SWPPP and other pertnit requirements including thc installation <br />and maintenance of DMPs, site inspections, and stormwater monitoring. <br />B. Sitc inspections <br />1. Site inspections shall include all areas disturbed by construction activities, all BMPs, <br />and all stormwater discharge points. Stormwater shall be visually examined for the <br />' Additional monitoring requircments may apply (or: I) discharses to 303(d) listed waterbodies and watcrbodies <br />with applicable T�IDLs for turbidity, finc sediment, high pl l, or phosphorus - sce Condition S8; and 2) sites <br />requimd to per:orni additional monitoring by Ecology order— see Condition G13. <br />, <br />- Soil dismrbance is calculated by adding together all arcas affected by construction activiry. Conswction Activiry <br />means clearing, grading, excavation, and any other acti��iry u�hich disturbs the sudace af the land, including <br />ingress/egrcss from the site. <br />3 Deeinning OGober 1, ?006, if constcuction activity im�olves significant concrete work or the use of engineered <br />soils, and stormwatcr from tlic affected arca dcains to a stormwater collection system or other surface water, the <br />Pcrmincc shall wnduct p[I sampling in accordancc �cith Condition S4.D. <br />a Beginning Octabcr 1, 2008, sites N�ith one or more acrcs, but less than 5 acres of soil disturbance, shall conduct <br />mrbidity or hansparency sampling in accordance with Condition Sa.C. <br />' Beginning October 1, ?006, si�es ereater than or equal to 5 acres of soil dismrbance shall conduct mrbidity <br />sampling usinc a turbidiry meicr in accordancc «ith Condition Sd.C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.