My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />NORTH MARINA REDEVELOPMENT <br />SHALLOW SOIL VCP CLEANUP ACTION <br />PARTI-GENERAL <br />1.01 DESCRIPTION <br />SECTION 01020 <br />MEASUREMENT AND PAYMENT <br />A. This Section specifies requirements for measurement of and payment for completed <br />�vork under this Contract. The scope of �vork in the Contract is divided into 12 base bid <br />pay items, as shown on the Proposal Form, for purposes of ineasurement and payment. <br />Any work required by the Contract Documents that is not specifically described in the <br />pay item descriptions shall be considered incidental to other items of work and shall not <br />be specifically measured for payment. <br />B. Contractor shall measure completed work as defined in these Contract Locuments and <br />shall compute all quantities required for measuring tasks and subtasks for the pay item <br />division of work; these quantities will be verified by the Pori and/or the GClCM. <br />Agreement between the Port and Conlractor shall bc reached on invoiced quantities and <br />amounts prior to submittal of each invoice. <br />C. Payments will be made at the respective lump-sum and unit prices for each pay item of <br />work in the Contract Price. All �vork specified in this Contract is included within the <br />pay items listed in thc Proposal Form and Ariicle 1.04 of this Section. Payment shall be <br />considered full compensation for furnishing all labor, materials and equipmcnt to <br />complete the work in accordance with the requiremen!s and intent of the Contract <br />Documents, including the Technical Specifications, Drawings, and Exhibits. Unless <br />othenvise stated, each pay item shall include all direct and indirect costs necessary to <br />complete the subjcct �vork of that pay item. <br />1.02 <br />r� <br />MEASUREMENT OF WORK <br />Lump Sum Pay Items <br />Items of �vork for �vhich pa�micnt is made by a"lump sum" shall be measured as a <br />complete unit. Labor, materials, or equipment used in lump-sum price pay items will <br />not be measured or paid for separately. <br />2. The lump sum pay items described in Ariicle 1.04 shall not be adjusted as a result of <br />change orders or extra work. The negotiated Contract Pricc for change orders or <br />e�tra �vork shall include additional provisions for any work that may be described as <br />part of an existing lump sum pay item. <br />3. Por lump sum or incidental pay item descriptions thal do not include estimated <br />qumui ' As, Contractor shall be responsible for estimating the pay quantities based on <br />infomiation provided in the Contract Documents, or other means as deemed <br />appropriate by Contractor. <br />100% Design Review Submittal <br />CIP No. 3-0-003-09 01020-1 Project No. PD-NM-2005-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.