My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />NORTH MARINA REDEVELOPMENT <br />SHALLOW SOIL VCP CLEANUP ACTION <br />� <br />1.03 <br />Unit Price Pay Items. <br />SECTION OI020 <br />MEASUREMENT AND PAYMENT <br />l. Items of work for �vhich payment is made by a"unit price" shall be measured <br />according to the methods and units described below and the applicable requirements <br />of the Contract Documents. <br />Z. Measurement Standards: All work to be paid for at a Contract Price per unit of <br />measurement shall be measured in accordance with United States Standard Measures <br />3. Mcasurement by Weight: Unless otherwise specified in the pay items of work, <br />earthwork materials from onsite activities, offsite suppliers, and similaz items to be <br />paid for by weight shall be measured by ceriified scales. Certified copies of supplicr <br />receipt invoices shall be provided specifying the type and quantity of material <br />actually furnished/received. <br />4. Measurement by Volume: Measurement by volume will be by the cubic dimension <br />listed in the Contract Price. Method of volume measurement will be by either the <br />mcthod of surveyed cross-sectional average end-areas or the method of computed <br />cross-sectional areas from lines, grades, and elevations determined by the Port or <br />GGCM to adequatcly represent the work, or computer-aided methods approved by <br />the Port. <br />5. Measurement by Area: Measurement by area will be by the square dimension listed <br />in the Contract Pricc. Method of square measurement will be based on either <br />horizontal or vertical planer projections, �vhichever is greater, unless othenvise <br />specified. <br />G. Linear Measurement: Linear measurement will be by the linear dimcnsion listed or <br />indicated in the Contract Price. Unless othenvise specified, components of work to <br />be measured �vill bc measured at the centerline of the work in place. <br />7. Time Measurement: Measurement by time will be by the time period listed in the <br />Contract Price, based on an 8-hour workday. All time measurements will be based <br />on an hourly log w]»ch shall be agreed upon and sigied daily between Contractor <br />and thc Port. The log will be used to allocate bet�veen operating and standby time <br />fbr Q�e pay item of �vork. Operating time shall be logged as specified. <br />INCRCASED OR DECREASED QUANTITIES <br />A. Pa�anent to Contractor �vill only be made for the actual quantities of the work performed <br />and accepted in conforniance with the Contract. When the accepted quantities of work <br />vary from the original bid quantities, pa�roient will be at the unit contract prices for <br />accepted work unless the total quantity of any pay item increases or decreases by more <br />than 25 percent relative to the original bid quantity. In that case, that part of the increase <br />or decrcasc exceeding 25 percent will be adjusted in accordance with Section 1-04.6 of <br />thc Z006 \��SDOT Standard Specifications. <br />CIP No. 3-0-003-09 <br />100% Design Re��iew Submittal <br />0102P Z Project No. PD-NM-2005-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.