My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERF.TT <br />NORTH MARINA REDEVELOPMENT <br />SHALLOW SOIL VCP LLEANUP ACTION <br />1.04 PAY ITEMS OF WORK <br />SECTION 61020 <br />MEASUR�,MENT AND PAYI�IENT <br />A. ITEM NO. 1: MOBILIZATION/DEMOBILIZATION AND WORK AREA <br />PREPARATION <br />l. Mobilization includes preparatory work and operations including, but not limited to, <br />those necessary for the movement of personnel, equipment and supplies to the <br />project site; and for all other associated work, sub�nitta]s, and operations which must <br />be performed, permits to be obtained, or costs inci;rred prior to beginning work on <br />the various items of the project. <br />2. Demobilization includes site cleanup and demobilization ofpersonnel, equipment <br />and cxcess materials and supplies from the project sitt. <br />3. Work area preparation includes: documenting existing conditions in the work azcas <br />by photographs, measurements, and other appropriate means; establishing work <br />zones and traffic control provisions; removin} existing fencing within the work azea <br />and installing temporary fencing around the work zones; and providing temporazy <br />construction facilities needed by Contractor. <br />4. Payment for mobilization/demobilization and work area preparation shall be on the <br />basis of the lump sum price stated in the Contractor's bid price for this pay item. <br />Mcasurement for this pay item shall be estimated un the basis of the percent <br />completc, rela�ive to the overall bid price and the actual progress towazd project <br />completion. <br />5. Thc lump sum price for this work is all inclusive, and includes all overhead and <br />profit. <br />B. ITEM N0. 2: REMUVAL/DISPOSAL OF EXISTING PAVEMENT <br />I. Work under this item includes saw cutting, removal, loading, transportation, and <br />recyciing/disposal of existing asphalt or concrete pavement and any existing curbing <br />to Uc rcmovcd from the work arca. <br />2. Pa�mient for rcmoval/disposal of existing pavement shall be on the basis of tons of <br />pavement and curbing transporicd and recycled/disposed at an appropriate offsite <br />facility, at the unit price stated in thc Contractor's bid orice for this pay item. <br />A4casurement for this pay item shall be deterniined on the basis of legible copies of <br />cerlified wcight receipts oi other documentation of �veight from the <br />recycling/disposal facility. <br />3. Thc unit pricc for this ���ork is all inclusive, and includes all ovcrhead and profit. <br />CIP No. 3-0-003-09 <br />100% Design Review Submittal <br />01020-3 Project No. PD-NM-2005-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.