Laserfiche WebLink
P�RT OF EVERETT SECTION O1020 <br />NORTH MARINA REDEVELOPMENT MEASUREMENT AND PAYMENT <br />SHALLOW SOIL VCP CLE�yNUP ACTION <br />C. 1TEM NO. 3: UTILITY PROTECTION/RESTOR �TION <br />l. Work under this ilem includes locating, marking, protecting, and physically <br />supporting existing active utilities within and near the work azea that could <br />potentially be damaged by the Contractor's work under this Contract, and any <br />restoration�repair of onsite utilities within or neaz the work area needed to restore the <br />utilities to their pre-existing conditions. <br />2. Payment for utility protection/restoration shall be on the basis of the lump sum price <br />st�ted in the Contractor's bid price for this pay item. Measurement for this pay item <br />shall be estimated on the basis of the percent complete, relative to the overal] bid <br />price and the actual progress toward project completion. <br />3. The lump sum price for this work is all inclusive, and includes all overhead and <br />profit. <br />D. ITEM NO. 4: STORMWATER MANAGEMENT <br />1. Work undcr this item in;ludes: diverting stormwater from adjacent areas to lirc�it <br />runoff from entering the excavation(s); installing catch basin filters and temporary <br />plugs into existing storni drain lines that are located within or near tl�e work azca; <br />installing all neccssary temporary sedimentation and erosion control measures <br />needed to protect partially completed work and prevent sediment transport from <br />exposed soil surfaccs and temporazy stockpiles to surface water or adjacent non- <br />work areas; and management of stormwater in accordance with the Specifications <br />and the SWPPP Supplement. <br />2. Paymcnt for stonnwater management shall be on the basis of the lump sum price <br />stated in the Contractor's bid price `'or this pay item. Measurement for this pay item <br />shall be estimated on the basis of the percent complete, relative to the overall bid <br />price and the actual progress to�vard project completion. <br />3. The lump sum pricc for this work is all inclusi��e, and includes all overhead and <br />profit. <br />�. ITGM NO. 5: HEALTH R. SAFETI', DECONTAMINATION, AND RESIDIiALS <br />MANAGEMENT <br />��l�ork under this item includes: developing and implc nenting a Site-Specific Hea�th <br />and Safety Plan that meets the requirements of the Technical Specificatiuns; <br />monitoring work activities for compliance with Plan requircments and providing <br />personncl training and required documentation; maintaining flagging and staking of <br />work zone boundaries and controlling personnel and equipment access to <br />contaminated zones; fumishing, installing, operating, and maintaining all required <br />health and safety equipment and facilities, including personnel decontamination <br />100% Design Review Submittal <br />CIP No. 3-0-003-09 01020-4 Project No. PD-NM-2005-03 <br />