PORT OF EVERE7'T <br />NORTH MARINA REDEVELOPMENT <br />SHALLOW SOIL VCP CLEANUP ACTION <br />F <br />SECTION 01020 <br />MEASUREMENT AND PAYMENT <br />facilitics and equipment decontamination facilities; fumishing all required worker <br />protection gear and equipment fur Contractor and subcontractor personnel; <br />decontaminating construction equipment and personnel health and safety equipment, <br />and collecting and dispo.sal of all decontamination water, contaminated solid wastes, <br />and residual matcrials. <br />2. Payment for health & safety, decontamination, and residuals management shall be <br />on the basis of the lump sum price statcd in the Contractor's bid prce for this pay <br />item. Measurement for this pay item shall be estimated on the basis of the percent <br />complete, relative to the overall bid price and the actual progress toward project <br />completion. <br />3. The lump sum price for this work is all inclusive, and includes all overhead and <br />profit. <br />ITEM NO. 6: EXCAVATION AND STOCRPILING ONSITE CLEAN SOIL <br />1. Work under this item includes excavating and stockpiling of onsite clean overburden <br />soil as designated by the Pori; and protecting such soil hom cross-contamination <br />until reused as clean backfill material for the site excavations. <br />2. Payment Cor excavating and stockpiling of onsite clean soil shall be on the basis of <br />cubic yards of such material as designated by the Port, at the unit price stated in the <br />Contractor's bid price for this pay item. Measurement for this pay item shall be <br />dcterniined on the basis ofonsite surveys made and volume estimates agreed to by <br />Contractor and the GGCM or the Pori. <br />3. The unit price for this work is all inclusive, and includes all overhead and profit. <br />G. 1TEM N0. 7: EXCAVATION AND STOCKPILING CONTAMINATED SOIL <br />l. Work under this item includes: excavating contaminated soil within the designated <br />soil rcmoval areas; segregating ineri waste &om solid ���aste materials; and <br />stockpiling and protecting these materials in separate lined, bermed, and covered <br />stockpiles until loaded for offsite disposal at either an inert waste landfill or a solid <br />waste land(ill. <br />2. Payment 1'or ezcavating and stockpiling of contaminated soil shall be on the basis of <br />cubic yards of such material as designated by the Pori, at the unit price stated in the <br />Contractor's bid price for this pay item. Measurement for this pay item shall be <br />determined on the basis of onsite sun�eys made and volumc estimates agreed to by <br />Contractor and the GC/CM or the Port. <br />3. 7'he unit price for this work is all indusive, and includes all overhead and profit. <br />]00% Design Rc��icw Submittal <br />CIP No. 3-0-003-09 01020-5 Project No. PD-NM-2005-03 <br />