Laserfiche WebLink
PORT OF EVERET7' SECTION 01041 <br />NORTH MARINA REDEVELOPMENT COORDINATION <br />�HALLOW SOIL VCP CLEANUP ACTION <br />C. Manage contract administration and cost accounting to maintain responsive, accurate, <br />and thorough reporting, documentation, and invoicing of the work in compliance with <br />applicable provisions of the Contract Documents. <br />3.02 MAPdAGEMENT PERSONNEL <br />A. Contractor's project manager shall have responsible charge oTthe work and have <br />complete authority to di,�ct the work, incleding negotiation of all issues affecting <br />Contract Price, Contract Time, personnel, and quality of workmanship. <br />B. Contractor's project superintendent shall have authority to direct and to manage all <br />aspecis of the work for Contractor. The project superintendent shall be experienced in <br />the prosecution of the �vork and the management of trades and subcontractors required to <br />accomplish the work. The project superintendent shall be present at the site at all times <br />while work is actually in progress on the Contract, or shall have designated an alternate <br />during low work periods. During any periods when work is suspended, arrangements <br />acceptable to the Pori shall be made for accomplishing any required stormwater <br />management, maintenance, or emergency work. <br />C. Contractor's health and safety officer shall have the authority to administer and <br />implement the health and safety provisions for the w�urk as specified in Contractor's <br />project-specific health and safety plan. <br />3.03 COOPERATION WITH OWNER AND PROSECUTION OF THE WORTC <br />A. Contractor shall work cooperatively with the Pori and its representatives, making all <br />reasonable cfforts to provide labor, equipment, supplies, and related support to facilitate <br />the collection of data required by the Pori and its representatives to carry out <br />em�ironmental monitoring, quality assurance, and collection of other data required for <br />soil cicanup action documcntation and reporting. <br />CIP No. 3-0-003-09 <br />END OF SECTION <br />]00% Design Review Submittal <br />01041-3 Project No. PD-NM-2005-03 <br />