My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />NORTIi MARINA RF.DEVELOPMENT <br />SHALLOW SOII, VCP CL.;:ANUP ACTION <br />3ECTION 01355 <br />ENVIRONMENTAL PROTECTION <br />undisturbed azeas. Where directcd, ground contaminated by such activities shall be <br />excavated, disposed of as approved by the Port, and replaced with suitable fill material, <br />ali at thc expense of Contrac!or. <br />1 A6 BUF2NIN 3 <br />A. No burning will be permittcd. <br />1.�7 AIIt EMISSIONS CONTROL <br />A. Maintain all excavations, fill areas, stockpiles, raaterial and equipmcnt stor�ge areas, <br />waste areas, borrow arcas, and all other work areas free from excess dust to such <br />reasonable dcgree as to avoid causing a hazard or nuisance 10 others. Air emissions <br />control shall be perfomied as the work proceeds and whenever a dust nuisance or hazard <br />occurs, in accordancc with Section 01565. <br />1,08 DRAINAGE AND EROSION CONTROL <br />A. Surface watcr control, managcment, and disposal within all work areas shall be the <br />responsibility of Contractor. Surface water disposal shall comply �vith all applicable <br />federal, state, county, and local laws, statutes, ordinances, and regulations. Surface <br />drainage from wori: areas shall be comained and surfaces shall be graded as appropriate <br />ro control crosion. Temporary control mcasures shall be provided and maintained until <br />pern�anent drainage mcasures are completed. Temporary erosion contro] measures shall <br />be installed to control the movement of erodible soil by surface water drainage. <br />Drainage and erosion control mcasures shall be carried out in accordance with Section <br />O15GG and the SWPPP Supplement includcd in Exhibit B. <br />1.09 CORRECTIVE ACTION <br />A. Upon receipt of i notice in writing of any noncompliance ���ith the foregoing prcvisions, <br />take immediate correcti��e action. If Contraclor fails or refuses to comply promptly, the <br />Port may issue an ordcr stopping all or pari of the work until satisfactory corrective <br />action has bcen taken. No part of the time lost due to a stop work order shall be made <br />the subject of a claim for eatension of time or for excess costs of damages by Contractor <br />unless it was later determined that the Contractor was in compliance. <br />1.10 POST-CONSTRUCTION CLEANUP OR OBI.ITERATION <br />A. Unless othernise instructed in writing by the Pori, obliterate all signs of temporary <br />construction facilities such as work areas, temporary stockpiles of excess or waste <br />materials, and other ��estiges of construction prior to fina] acceptance of the work. The <br />disturbed azcas shall be filled as necessary to restore original grades, and graded to <br />promote proper stortnwater runoff. <br />CIP No. 3-0-003-09 <br />100% Design Review SubmiY.al <br />01355-2 Project No. PD-NM-2005-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.