My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECTIOT 01550 <br />NORTH MAItINA REDEVELOPMENT TRAFFIC CON fROL <br />SHALLOW SOIL VCP CLF,ANUP ACTION <br />B. Provide and maintain in acceptable condition and effectiveness all necessary bamcades, <br />signs, waming lights, flaggers and spotters, and other devices needed or required by law <br />or re�.11ation or the site-specific health and safery p]an. <br />C. Site security will be acceptable if theft and vandalism is prevented, ingress ai�d egress to <br />the work areas and to any offsite staging and storage areas is controlled during work <br />hours and prevented at other times, and access to contaminated azeas is controlled in <br />accordance with the site-specific health and safety plan. <br />PART3-EXECUTION <br />3.01 TRAFFIC CONTROL <br />A. Implement traffic control requiremcnts specified in the Contract Documents and as <br />otlienvise directed by the Port or the GC/CM. <br />B. Exercise strict control of vehicle and equipment movement from exclusion to suppori <br />zones, including mandatory decontamination. <br />C. Coordinate the amval and departure of vehicics transporting supplies, materials, and <br />subcontractors throughout the �vork day to minimize the potential for accidents, damage <br />to cquipment, vehicles, and real or personal properly, and injury to personnel at or near <br />the sitc. <br />3.02 ACCESS ROADS <br />A. Maintain all sitc and offsile access roads in a clean condition as required or as <br />specifically directed by the Port or the GGCM 1'or the duration of the work under this <br />Contract. Provide street cleaning and provide air emission control during periods of <br />hauling of materials to and from the site. <br />B. Control vchicular tra+'fic and stage work areas in a manner that minimizes adverse <br />impacts to the Pori aiid its tcnants, their businesses, and their customers; parking areas; <br />riglits-of-way; roadways; and access points. <br />C. 1Vhen necessan� Uecause of construction activity adjacent to existing streets, erect <br />bamcades or teroporarily assi�n laborers to flag traffic throueh an affected area to <br />provide protcction to indi��iduals and vehicles using the public rights-of-way. <br />100% Desigo Review Submittal <br />CIP No. 3-0-003-09 01550-3 Project No. PD-NM-2005-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.