Laserfiche WebLink
PORT OF EVERETT <br />NORTH MARINA REDEVELOPMENT <br />SHALLOW SOIL VCP CLEANUP ACTION <br />3.03 PROTECTION OF SITE FACILITIES <br />SECTION 01550 <br />TRAFFIC CON 1 ROL <br />A. Control construction traffic so that existing site facilities are protected from damage. <br />Repair any damage caused by Contractor's activities at no additional cost to the Pori. <br />3.04 JOB SITE SECURITY <br />A. Restrict work area access points to locations designated by the GC/CM. Post signs <br />directing persons to approved site access locations. <br />B. Install temporary fencing as needed to accomplish the work. Temporary fencing shall be <br />installed, relocated as required for closing and reopening of specific work areas, and <br />maintained in satisfactory condition in accordance with industry-recognized methods <br />using materials approvcd by the Pori. Lock all access gates during nonworking hours. <br />3.05 WORK ZONES <br />A. Provide stakes and Ilagging boundarics for the various site work zones (cxclusion zones, <br />contamination reduction zones, and suppori zones) in accordance with Contractor's site- <br />specific health and safety plan. Prevent people and equipment from exiting the <br />exclusion zone �vitliout proper decontamination at a contamination reduction zone. <br />B. All Contractor personncl and visitors to the designated work areas shall be briefed on <br />site �vork zone boundaries, relevant site security procedures, and required levels of <br />health and safety protection for the work zones. <br />3.06 DISPUSAL <br />A. Unless othenvisc approved by the Port, provide for offsite disposal of existing fencing <br />and other materials removed to accommodate the shallo�v soil cleanup action tasks. <br />CIP No. 3-0-003-09 <br />END OF SECTION <br />]00% Design Review Submittal <br />01550-4 Project No. PD-NM-2005-03 <br />