My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />NORTH MARINA REDEVELOPMENT <br />SHALLOW SOIi. VCP CL�ANUP ACTION <br />PART1-GENERAL <br />].O1 WORK INCLUDED <br />SECTION 01560 <br />UTILITY PROTECTION <br />P.. This section specifies general requirements for protection of existing utilities at and near <br />the site. Evaluate requirements for protection of utilities as necessary to accomplish the <br />work and provide, install, and maintain the required protection of utilities as pari of the <br />work. <br />B. Utility lines present at and near the site includc surface and subsurface utilities. Ceriain <br />active utilities in the areas of the work have been identified on the Drawings. However, <br />tlie Pori neither guarantees thc exact location of the utilities identified on the Drawings <br />nor guarantees that all utilities that may be affected by the work under this Contract have <br />been identified. Contractor shall refer to the latest version of the site utilities map <br />prepared by David Evans and Associates (DEA), and shall be responsible for the <br />identification and location of all utilities that require protection during implementation <br />of the shallow soil cleanup action. <br />1.02 SUBIvfITTALS <br />A. As pari of Contractor's construction plan submittal, provide plans and methods for <br />identification and protection of active utilities encountered within or neaz the soil <br />excavalion arcas. <br />PART2-PRODUCTS <br />2.01 MATGRIAL AND EQUIPMENT <br />A. Provide all necessary equipment and materials required by la�v or regulation, or as <br />necessary to safely maintain protection of utilities and to protect site personncl. <br />PART3-EXECUTION <br />3.01 GENERAL <br />A. Install and maintain necessary protcction of utilities for the duration of the project in <br />accordance ���ith applicable codes and regulations, these Specifications, and the <br />requiremcnts of the applicable utility purveyor and the Pori. <br />]00% Design Review Submittal <br />C{P ho. 3-0-003-09 01560-1 Project No. PD-NM-2005-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.