My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />CIP NO. 3-0-003-09 <br />PROJECTNO. <br />PD-WM-20006-01 <br />Supplementai grounding shall be provided at light standards, signal standards, cantilever sign <br />structures, and sign bridges. Steel sign posts which support signs with Aashing beacons shall <br />also have supplemental grounding. Foundations for these standards shall be installed with a <br />bare, 6 ANlG <br />copper wire that is connected to the reinforcing cage with an approved acom ciarc�p or <br />exothertnic weld and routed to connect to the pole at the grounding lug. <br />Measurement <br />Section 8-20.4 is s� lemented with the follawing: <br />No measurement will be made for "Illumination System-West Marine Vew Drive'. <br />Pavment <br />Section 8-20.5 ;a supplemented with the following: <br />Payment will be made in accordance with Section 1-04.1, for each of the foll��wing bid items that a2 <br />;ncluded in the proposal: <br />"Ilumination Systern- West Marine View Drive', lump sum. <br />The lump sum contract price for'lllumination System• West Marine View Drive shall be full pay <br />for the construction of the complete electrical system, modifying existing systems, or both, as <br />shown in the Plans and herein specified including excavation, backfilling, concrete foundafions, <br />conduit, wiring, restoring facilities destroyed or damaged during construction, salvaging existing <br />materials, and for making all required tests. All additional materials and labor, not shown in the <br />Plans or called for herein and which are required to complete the electrical system, shall be <br />inciuded in the lump sum cont�act price. <br />FJI costs for installing conduit containing both signal and illumination wiring sha'I be included in <br />the contract prices for the signal system. <br />All costs for installing junction boxes containing both illumination and signal wiring shall be <br />inciuded in the contract prices for the signal system. <br />All costs for adjustment of junction boxes, both to the final grade and any grade adjustments <br />required for the various consUuction stages proposed in the Contract, or for altemative stages <br />proposed by the Contractor, shall be included in lhe lump sum contrect price for the associated <br />electrical system. <br />Grounding Existing Junctir�n Box" shall be incidental to the illumination system and no additionai <br />payment will be made. <br />Page 44 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.