Laserfiche WebLink
�5 <br />�. prepare enginaerinB �o�ction cost estimates for improvements• <br />g Meet with City staff and Port of Everett representative and ceview items 1 thni 7• <br />Raoonsibiliri of Oq'ner <br />1, Attend raview meeting. <br />2, Complete SEPA review. <br />Task Deliverabies <br />2. <br />3. <br />4. <br />6. <br />Floor plans and mechanical configuration. <br />Geotechnical Report. <br />Equipment information. <br />Construction cost estimate. <br />Ivfinutes from revie�v meeting. <br />Provide a maximum of t�ee figLres for SEPA review. <br />�, PUBLIC INVOLVE�`�T <br />�:+:•:�� �f Ea iQ neer <br />Resoonss� <br />This will include involving the public in makinS decisions related to the aesthetics of Lift <br />Station No. 8• This will include leading two workshop sessions. This anticipates the <br />inclusion of a screen wall and landscaping to the east of Lift Station No. 8 in the design. <br />1, prepaze chree azchitect renderings of a west elevation of Lift Station No. 8. <br />Z, Lead workshop session which will address the following: <br />. Descrincion of facility <br />. Noise mitigation <br />. Odor mitigation <br />• Screen wall selection <br />. LandscaPinB selection <br />Res onsibilitv of Owner <br />1, Provide invitacions to workshop participanu. <br />2. Arrange location for workshop. ' <br />Task De� <br />t_ Architectural renderings - West Elevation (3 altematives - fall size) $ Q <br />A_� Lift Statian Nos. 7& 8 Upgrndes <br />May 1a. l997 <br />