My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />1 <br />' <br />' <br />PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />CIP NO. 3-0-003-09 <br />PROJECTNO. <br />PD-WM•20006-01 <br />2. Aspha�t Binder Content. The Project Engineer may order or approve <br />the Contractor's request to change asphalt binder content a <br />maximum oi 0.3 percent from the approved JMF. No fieid <br />adjustments of the JMF relative to the asphalt binder conler�i <br />exceeding 0.3 percent irom the initial JMF will be made without the <br />approvai of the Materials Engineer. <br />D. Commercial HMA Acceptance. The contractor shall submit a certification that the mix <br />� design submitted meets the requirements of Proportions of Materials. VerificaGon of <br />the mix design by the Contracting Agency is not required. The Project Engineer will <br />detertnine anti-strip requirements for the HMA. <br />4. Hot Mix Asphalt Mixture <br />A. Sampling <br />A sample will not be obtained (rom either th� first or last 25 lons of mix produced <br />in each production shifl. <br />2. Samples (or compliance of gradation and asphalt binder content will be obtained <br />on a random basis from the hauling vehicle. The Contractor shall provide <br />adequate platfortns to enable samples to be obtained in accordance with <br />WAoTC FOP for AASHTO T 168. The platlorms shall ailow the sample to be <br />taken wilhout the Engineer entering the hauling vehicle. <br />B. Definition ot Sampling Lot and Sublot. For the purpose of acceptance sampling and <br />testing, a Iot is defined as lhe total quantity oi material or work produced for each job <br />mix formula (JMF), placed and represented by randomly selected samples tesled for <br />acceptance. All of the test results obtained irom the acceptance samples shail be <br />evaluated collectively and shall constitute a lot. Only one lot per JMF will be expected <br />to occur. The JMF (Job Mix Formula) is defined in Basis of Acceptance. <br />The Contractor may request a change in the JMF. If the request is approved, ali of the <br />material produced up to the time of the change will be evaluated on the basis of <br />available tests and a new lot will begin. The quantity represented by each sample will <br />constitule a sublot. Sampling and testing for statistical evaluation shall be performed <br />on a random basis at lhe irequency of one sample per sublot, with a minimum of <br />five sublots per ctass of HMA. Sublot size shall be detertnined to the nearest 100 tons <br />to provide not less than five uniform sized sublots, based on proposal quantities, with <br />a maximum sublot size of 800 tons. <br />Sampling and testing for nonstatistical evaluation shall be performed on a random <br />basis at a minimum frequency of one sample for each sublot oi 400 tons or each <br />day's production, whichever is least. When proposal ouantities exceed 1,200 tons for <br />a class of HMA under nonstatistical evaluation, sublot size shall be determined to the <br />nearest 100 tons to provide not less than three uniform sized sublots, based on <br />proposal quantities, with a maximum sublot size of 800 tons. <br />Page 18 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.