My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
200 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
200
>
200 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:24:28 AM
Creation date
2/27/2017 6:29:50 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
200
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br />la <br />PORT OF EVERETT <br />`a BAYWOOD AT PRESTON PO[NT SITE PREPARATION <br />" PARTI-GENERAL <br />� • � SECTION INCLUDES <br />A. <br />_ B. <br />C. <br />D. <br />..- L2 <br />A. <br />B. <br />C. <br />l.3 <br />A. <br />B. <br />1.4 <br />Removing existing overhead utilities <br />Capping existing water and sanitary sewer services <br />Demolition of existing structures <br />Demolition of existing wncrete and asphalt <br />RELATED SECTIONS <br />SECTION ; ?psp <br />DEMOI.ITION <br />Section O101O - SUMMARY OF WORK <br />Section 02200 - EARTHWORK <br />Section 02273 - EROSION CONTROL <br />REGULATORY REQUIREMENTS <br />Conform to City of Everett code for disposal of debris. <br />Comply with all applicable federal, state and local codes and safety regulations. <br />MEASUREMENT AND PAYMENT <br />A• The lump sum prices for the following items shall be full payment for all labor, materiai, <br />eyuipment, h:iu}, and disposal fees required to complete demolition, and disposa! of <br />materials as or.tlined in this section and as detailed on the drawings. Payment for all <br />work under this section will be included in the following lump sum bid prices under the <br />following Altemate Work Bid items: <br />"Remove Existing Overhead Utilities" shall include all work associated with <br />disconnecting utility service, removal and disposal of existing overhead utility <br />lines and appurtenances including power and telephone service lines and support <br />poles within the limits of work. Psyment shall be lump sum. No measurement <br />shall be made. <br />02050-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.