Laserfiche WebLink
u <br />POR'i' OF EVERETT <br />BAYWOOD AT PRESTON PO1NT SITE PREPARATION <br />SECTION 020511 <br />DEMOLITION <br />2. "Demoliaon of Existing Structures" shall include all work associatecl �V�th <br />removal and disposal of existing scructures including Buildings "A", "B", "C". <br />and "D" idenufied on the drawings as capping of existing sanitary sewer aud <br />water services, removing exisdng pipe, and backfilling and compacting venches. <br />Payment shall be lmnp sum. No measurement shall be made. <br />3. "Demolition of Existing Concrete and Asphalt" shall include all work associated <br />with demolition, breaking up rubble, saw cutting, removal, and disposal of <br />existing concrete and asphalt. Payment shall be lump sum. No measurement <br />shall be made. <br />ALTERNATES <br />All Work of this section consists of alternatcs. <br />PART2-PRODUCTS <br />NOT USED <br />PART 3 - EXECUTIOv <br />3,1 PREPARAT(ON <br />q, Verify erosion control is installed and functioning. <br />g, Verify utilities aze marked. <br />� C. <br />' 3.2 <br />A. <br />B. <br />_ C. <br />3.3 <br />„ <br />Verify power and telephone services are 3isconnected from power and main line <br />connection Qrior to removing overhead utilities. <br />PROTECTION <br />Locate, identify, and protect udliues that are to remain from damage. <br />Protect bench mazks and survey mazks froni damage or displacement. <br />Protect exisdng right of way improvements from damage. <br />REMOVAL OF EXISTING OVERHEAD UTILITIES <br />02050-2 <br />