My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/07/12 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/07/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:26:45 AM
Creation date
2/27/2017 10:25:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN ELEMENTS <br /> Traffic/Parking/Transit/Bike Pedestrian & Adjacent Land Use Implementation Actions C+ <br /> • Heavy through-traffic. Visually prominent. j • Pedestrian connector between • Undertake a corridor study to <br /> Broadway <br /> • Median where possible. (Between � Hewitt and 32"0 (Event Center to identify how rail/BRT transit will <br /> California and Wall?) Everett Station). affect transportation role. <br /> • Minimize left turns except at intersections. • Development in transition. • Design preferred cross-section. <br /> • Four lanes with parallel parking. i • Identify redevelopment strategy. <br /> • Heavy transit street. <br /> • Potential HOV lanes or rail may <br /> restrict/eliminate parking. <br /> • No bike lanes (transit). <br /> Everett and • Visually prominent Gateway Streets. • Planting strips (between sidewalk • Plant continuous street trees and <br /> • Make connedtor between Rucker and and street) where there is not on- install median where possible. <br /> Pacific W.M.V. Drive. street parking. • Sidewalks improved as part of <br /> • Four lanes, heavy traffic. development. <br /> • Minimize left turns except at intersections. • Explore options to improve the <br /> • Median where possible. i image of Everett, Hewitt, and <br /> Pacific from the riverfront to <br /> • Heavy transit(Pacific). downtown. <br /> Hewitt • Gateway Street. • Pedestrian, retail and transit • Extend street trees, median and <br /> • Four lanes with parallel parking, heavy priority. lights to the waterfront. <br /> traffic. • Pedestrian-oriented services and • Increase transit service west to <br /> • Through truck traffic not allowed. facades required on ground-floor. Rucker as development occurs. <br /> • Transit-oriented street; extend to Rucker <br /> with development. <br /> • Potential streetcar to waterfront? <br /> California • Parking/circulation. • Part of Livability Loop/pedestrian • Change angled parking to parallel if <br /> • Angle parking. connectors. designated as bike route. <br /> • Could be good bike route; convert to • Sidewalk bulbs at Livability Loop • Install trees and lights where <br /> parallel parking if bikes designated. corners, needed. <br /> Wall • Parking/circulation for residences and • Part of Livability Loop/pedestrian • Install trees and lights where <br /> government offices, connectors. needed between Rockefeller and <br /> • Sidewalk bulbs at Livability Loop W Marine. <br /> corners. <br /> • Has recently been improved. <br /> EVERETT DOWNTOWN PLAN — DRAFT 6/29/2006 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.