Laserfiche WebLink
Ltr. Fagerlie (CO510-006) <br />June 26, 2.')07 <br />Page 2 <br />Item N11: Provide details and/or sections for balcony framing and guard constructions. <br />The detail submitted does not clearly show the construction or attachment of the proposed <br />guard. All connections shall be specifie�d. Provide flashing as needed. Show sheathing <br />and siding as applicable. Specify spacing for intermediate components. <br />Item 14: The hanger for the 6 x 12 bcam was changed to the correct hanger, but the <br />double joists will still use the Simpson U210-2 hanger. Please revise. <br />NEW CORRECTIONS <br />1. Provide section/detail of how the below grade, concrete interior walls at the lower <br />level are finished. The dimensions shown if added rogether are 4" wider than 17'- <br />10". <br />2. Provide sections specific to this building. The section called uut on Sheet S-1 was <br />noc included �vith this suUmittal. <br />3. Cantilevers and roof overhangs arc not allowed to extend more than 18" into a <br />required setback. The roof at the caniilever in the kitchen cannot extend beyond the <br />cantilevcr. <br />4. Provide lettcr or stamp on drawings q�at tl�e eugii�eer has reviewecl the drawings for <br />compliance with the structural calculations dated 3/9/2007. <br />5. Shou� (2) 2 x 6 studs � 10" u.c. on thc framing plans. (Called out in structural <br />calr,ulations). <br />6. The plans IaUel the lowcr tloor as "3"' bedroom/bonus room." A gas furnace and <br />wattr heater cannot be accessed from a room used for sleeping. Please revise t(�c <br />plans. <br />7. The site co�ditions appear to be steeper Uian what is shown on the elevations, <br />specificatly the rear elevation. The grade drops significantly to the north which could <br />triggcr d�e requirement for a guard along the north edge of the landing at the lower <br />level. Provide detail for guard at the rear landing (patio). <br />Plcase prcparc a response letter showing wliere each ilem in diis correction letter is addressed <br />on thc �+lan sct. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall Ue of sufficient detail and contain sufficient information to ensure <br />that the propose�9 structure will be constnicted in compliance with all adopted codes. <br />Sincerely, , <br />���✓`--- <br />Jcff Hcilman <br />Deaelopment Technician <br />1)I:DI:PINfAMSTN!IIGIIAUNlNSIOdM0121 P(XfKLI'IiIl1iRA\'61-1 <br />� <br />