Laserfiche WebLink
proposes that the electrical to be added will be placed at 4 <br />feet above the floor slab. New walls to be installed will be <br />constructed with styrofoam insulation and gypsum water board to <br />a height of 4 feet above the floor. Only a small portion of <br />the tutal structure will be finished as a heated space, the <br />remainder of the structure will have expo,.ed studs, wood siding <br />and no insulation. Except for the existing concrete floor no <br />finished floor covering will be provided. Except for the <br />existing floor drains no plumbing will be installed. With this <br />type of construction any flood damage would be minimal. <br />B. New Temporary Boat Display Shed <br />This proposal consists of constructing a display building for <br />the boat sales area at Dagmar�s. The proposed structure is to <br />be totally open on all sides. No grading, fill or excavation <br />will be required. No electrical or plumbing will be provided <br />to the building. This structure is to be used for the display <br />of new boats now being sold at Dagmar's so that customers can <br />stay out of the rain while looking at the boats. If sales of <br />new boats proves to be a worthwhile proposition at Dagmar's, <br />this structure would be removed and a new sales office, display <br />area and maintenance building would be proposed under a <br />separate permit application to the City of Everett. <br />The variance request is to be able to place the structure at <br />the existing site elevation of 4.5 feet. To raise the grade <br />elevation above the 100 year flood level, which is 9 feet, <br />would entail the placement of an enormous amount of fill in the <br />area in order to create a smooth transition in grade from the <br />existing dry storage area to the new building grade. Due to <br />the close proximity to the proposed structure of an existing <br />sales office (originally constructed as a farm house prior to <br />I-5 bi—secting the property) either extensive rockery would <br />need tc be added to the immediate area or the sales structure <br />raised. Either one of these alternates would be a detriment to <br />the existing operations of Dagmar*s Marina. <br />Floodproofing: <br />Under National Flood Insurance Program (NFIP) standards, new <br />non—residential construction must attain either a watertight degree <br />of floodproofing (i.e., dry floodproofing) or be elevated such that <br />the buildings lowest floor is located above the regulatory flood <br />elevation. Fither condition must be met for the structure to be <br />recognized for insurance premium reductions. New construction not <br />built to these standards can be subject to extremely high insurance <br />premiums. <br />The Federal Emergency Management Agency does, however, recognize that <br />a "lesser degree" of floodproofing may be an appropriate flood damage <br />protection technique for certain types of structures and their uses. <br />Such methods, categor'zed as "wet floodproofing" involve purposely <br />designing a building for inundation by potable water or floodwaters, <br />but in a manner that results in minimal damage to the building or its <br />contents. In these situations, the granting of a variance by a <br />community may be justifiable if application of dry floodproofing <br />regulations would constitute an exceptional hardship and the <br />circumstances meet all variance criteria in Para. 60.6(a) (see <br />Exhibit 4) of the NFIP Regulations. <br />Conclusions: There are exceptional circumstances applying to this <br />property that do not apply generally to other properties in the <br />vicinity and zone. <br />—2— <br />