My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2111 ROSS AVE 2018-01-02 MF Import
>
Address Records
>
ROSS AVE
>
2111
>
2111 ROSS AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2022 8:57:26 AM
Creation date
2/27/2017 2:52:23 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
2111
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J 1. On -grade floor slabs, including recommendations for below -slab capillary breaks and <br />moisture retarders, as appropriate; <br />in. Geotechnical criteria for stormwnter management facility evaluation and design; <br />n. Feasibility of on -site septic systems; <br />o. Temporary and permanent drainage improvements, including recommendations for <br />I controlling groundwater during construction and for permanent drainage systems (e.g. <br />foundation and wall drains), and <br />p. Pavement design for the access road, parking, and yard areas. <br />1 8. Provide project management for the geotechnical tasks and attend one meeting with the <br />1 project team. <br />I PREVIOUS STUDIES <br />In addition to the explorations completed as part of this study, the logs of borings completed <br />as part of previous studies in the project vicinity were reviewed. Subsurface information <br />presented in the following reports was reviewed as part of this study: <br />• GeoEngincers, Inc., 1998. "Report, Geotechnical Engineering Services, New Aggregate <br />1 Conveyor, Everett Aggregate Yard, Smith Island, Washington," July 1998. <br />• GeoEngincers, Inc., 2001. "Report Geotechnical Engineering Services, Proposed <br />I Dock/Bulkllead Rehabilitation Glacier Northwest — Smith Island Everett, Washington," June <br />4 2001. <br />• GeoEngineers, Inc., 2001. "Report Geotechnical Engineering Services, Proposed Conveyor <br />I Foundations Glacier Northwest — Smith Island, Everett, Washington," July 2001. <br />In each of the studies listed above, exploration logs or detailed descriptions for borings and <br />test pits were presented for the general project vicinity. Two borings completed for the July 2001 <br />GeoEngincers report were completed in the immediate vicinity of the Wilder site and the boring <br />logs for these explorations have been included in Appendix C. The locations of these two <br />borings, designated borings C-1 and C-2, are shown on the Site Plan, Figure 2. <br />FIELD EXPLORATION AND LABORATORY TESTING <br />FIELD EXPLORATION <br />1 Subsurface conditions were evaluated by a field exploration program that consisted of drilling <br />and sampling two mud rotary borings at the site using a track -mounted drill rig, and excavating <br />nine test pits using an excavator. The approximate locations of the borings and test pits are <br />1 shown on Figure 2. <br />The borings, designated B-1(02) and B-2(02), were advanced to depths of 101 /, and <br />l 2G--%: feet below the ground surface, respectively. The borings were located in the vicinity of the <br />proposed asphalt plant equipment. <br />The test pits were excavated around the site to evaluate the soil conditions for the stockpiles, <br />( access roads, parking areas, shop building, infiltration pond and other planned improvements. <br />h The test pits ranged in depth from id%: to 17 feet. The boring and test pit locations were located <br />IG e o E n g i n c e r s 3 File 3101-020-OO\072502 17� 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.