My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1510 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1510
>
1510 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2019 2:00:40 PM
Creation date
3/7/2017 10:02:14 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1510
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCATION: <br />ZONING: <br />GENERAL PLAN: <br />LEAD AGENCY: <br />ContactPerson: <br />Backaround <br />1402 SE Everett Mall Way <br />Cl-R, Regional Commercial-Office <br />4.4 Mixed Use Commercial, Multiple Family <br />City of Everett Planning Department <br />Faheem Siddiq Phone: (425) 257-7142 <br />On August 8, 2003 the City of Everett issued a Final Determination of Non-Significance (SEPA #03- <br />026) including an approved Site Plan dated May 27, 2003 for the proposed Everett Mall Expansion <br />Project. On ]uly 27, 2004 Mulvanny G2, on behalf of Steadfast Properties submitted a Revised Site <br />Plan (7-27-04) for the proposed Everett Mali Expansion Project. The proposed Revised Site Plan <br />(7-27-04) is similar to the approved Site Plan (5-27-03) with the exception of the following <br />modifications: <br />. Re!ocation of the interurban treil and the ring road to the west side of the property. <br />. Existing bank to remain. <br />. Reconfiguration of the proposed village shops per the site plan dated ]uly 27, 2004. <br />. Addition of two (2) new restaurant pads at the southwest corner of the property. <br />. Modifications of the existing detention ponds. <br />. Sears' expansion. <br />Based upon a review of the current Revised Site Plan and related comments from the City's Traffic <br />Engineer, Building, Fire and Public Works Department staff, the City will issue an Addendum to the <br />Final SEPA MDNS (SEPA #03-026) for the proposed Everett Mall Expansion Project. The Final SEPA <br />Addendum (SEPA #03-026) shall apply to the current Revised Site Plan dated July 27, 2004 and <br />attached as Exhibit A. NOTE: The applicant must comply with all requirements and/or conditions <br />in the Final SEPA MDNS Addendum (SEPA #03-026) including standards, specifications and <br />easement requirements for all proposed surFace water detention and water quality treatment <br />facilities. Also, lhe applicant must comply with the City of Everett's Fire Code Ordinance and the <br />International Fire Code Ordinance. <br />Mitiqation Measures: <br />The environmental impacts of this proposal are documented in the Environmental Checklist and <br />other information on file with the City. The listed requirements are placed in response to our <br />review of this information: <br />AGENCIES WITH JURISDICTIOPd <br />NONE <br />
The URL can be used to link to this page
Your browser does not support the video tag.