My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murray, Smith, and Associates, Inc. 2/1/2017
>
Contracts
>
6 Years Then Destroy
>
2020
>
Murray, Smith, and Associates, Inc. 2/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:56:05 PM
Creation date
3/7/2017 3:55:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murray, Smith, and Associates, Inc.
Approval Date
2/1/2017
Council Approval Date
1/25/2017
End Date
6/30/2020
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2 Preliminary Design
Public Works WO Number
UP3658-1
Tracking Number
0000483
Total Compensation
$393,165.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions: <br /> • Anticipated notice to proceed will be on or about January 19, 2017. <br /> • Preliminary design services will be completed according to the schedule(Exhibit C). <br /> Task 102 - Project Coordination <br /> 102.1 Kick-off Meeting—Prepare for and attend project kick-off meeting with City staff and key <br /> team members. Prepare meeting agenda and meeting summary(draft and final). <br /> 102.2 Coordination with City Staff—Coordinate and meet with City engineering and operations <br /> staff to discuss project elements and gather input on key issues related to all project elements <br /> MSA Deliverables: <br /> • Agenda and summary of all meetings. <br /> City Responsibilities: <br /> • Coordinate with project team, assist with scheduling meetings, and attend meetings. <br /> • Review meeting agendas,meeting summaries, and provide comments to MSA. <br /> Assumptions: <br /> • One kick-off meeting will be attended by up to five MSA team members. <br /> • Up to three project coordination meetings with City staff will be attended by up to four <br /> MSA staff <br /> • Coordination other than through meetings will be accomplished up to the hours shown in the <br /> fee estimate. <br /> Task 201 - Data Collection and Utility Coordination <br /> 201.1 Data Request List—Coordinate with City on preliminary data needs and availability of data <br /> prior to full development of a data request list. Prepare a list of data needed for the project, <br /> submit initial list to the City during project kick-off, and coordinate with the City during the <br /> data collection process. This includes preparing additional lists of supplemental data needed <br /> for the project, as necessary. Approximately three data requests are estimated. <br /> 201.2 Review Data and Information—Review data and information provided by the City and <br /> extract relevant information for the project. This will include: <br /> • Gather and review existing mapping, design drawings, engineering reports and other <br /> data related to the project site. <br /> • Review of existing site drainage and reservoir drainage, overflow and outfall facilities. <br /> • Review of existing water transmission piping,valving and reservoir operations, <br /> including available SCADA data. Reservoir operations information to be provided in <br /> meeting with City, in addition to SCADA data availability. <br /> • Review of existing site access, site access easements and utility easements. <br /> • Review of existing site security provisions. <br /> • Extent of yard piping replacement and pipe condition assessment. <br /> 201.3 Utility Coordination and Analysis—Acquire utility system mapping from all utilities located <br /> within the project area. Perform a utility conflict analysis for the preliminary onsite <br /> pipelines to identify potential utility conflicts. Develop a list of potential conflict locations <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC. Replacement of Reservoir 2 <br /> January 12,2017 Engineers/Planners Prelim Design Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.