Laserfiche WebLink
' Public Utility District No. 1 Technical <br /> of Snohomish County Specification No. 1317 <br /> ��erett, Washington 98201 April 18, 199U <br /> Page 23 of 76 <br /> SITE PREPARATI_pN - OLIVIA PARK SUBSTATION <br /> 4.0 TEMPORARY EROSION AND SEDIMENTATION CONTROL <br /> 4.3 CONSTRUCTION (continued) <br /> 4. Fertilizing <br /> The CONTRACTOR shall fertilize the hydro-seeded areas <br /> with Par Ex 24-4-12 at the rate of 6.25 pounds per 1000 <br /> square feet as follows: <br /> lst Application: Not earlier than four weeks and not <br /> later than six weeks after seeding. <br /> 2nd Application: Four to six weeks after first <br /> application but not to exceed ten <br /> weeks after seeding. Should second <br /> application occur after October l , <br /> CONTRACTOR shall apply DISTRICT- <br /> approved "winterizing" fertilizer, <br /> such as "Agro Lawn Winterizer," or <br /> approved equal , in lieu of Par Ex. <br /> The CONTRACTOR shall notify the DISTRICT prior to <br /> fertilizer applications. <br /> END OF SECTION <br /> (344X) <br /> �n <br />