My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> , <br /> i1 Contractor's Responsibilities <br /> 2 The Contractor shall review shop drawings, pmduct information, and project <br /> ( 3 data before submission and verify field dimensions, constr��ction criteria, <br /> I 4 catalog numbers, and other data. The submittals shall be coordinatad with the <br /> 5 rsquirements of the Work and the contract documents. If there is a deviation <br /> i 6 from the requirements of the contrect documents, the submittal transmittal shail <br /> 7 ciearly indicate the deviation. See Special Provision SUBSTITUTIONS for <br /> 8 related information. <br /> � � <br /> I10 The Contractor is not relieved of responsibility for errors and omissions in <br /> 11 s�bmittals by the Engineer's review or approval of submittals. Furthermore the <br /> 12 Contractor is not relieved of responsibility for deviations from the requirements <br /> 13 of the contract documents due to the Engineer's review or approval of <br /> 14 submittals. <br /> 15 <br /> 16 The Conlractor shall not proceed with any work where submittals are required <br /> 17 until submittals are retumed with the Engineer's stamp and initials indicating <br /> 18 review and approval. <br /> I 19 <br /> 20 Color Selection <br /> 21 Tha Contractor shall submit to the Engineer or Architect all items that require <br /> 1 22 color selections at one time. This submittal shall be scheduled a minimum of <br /> 23 30 days before the reviewed submittals are needed by the Contractor to avoid <br /> 24 delays. The submittal for color selection shall include but is not limited to: <br /> , 25 sealants, plastic laminate, identifying devices, paints and stains, aluminum <br /> , 26 finishes, roofing, siding, and flooring. <br /> 27 <br /> 28 Schedule of Submittals <br /> 29 The Contractor shall submit a schedule of submittals using the Record of <br /> � 30 Material and coordinate it with the Project Construction Schedule. The <br /> 31 schedule shall designate review times in accordance with Section 1-05.3 or as <br /> ! 32 indicated otherwise in the Standard Specifications and Special Provisions. No <br /> 33 additional time will be considered for submittals that require resubmittal. <br /> 34 <br /> � 35 Working Drawings, Product Information and Project Data <br /> � 36 When working drawings, product information, and/or other project data are <br /> 37 required, the Contractor shall furnish as follows: <br /> � 38 <br /> � 39 Ori mal Drawin s <br /> i 9 9 <br /> 40 Original drawings shall illustrate some portions of the woric showing <br /> I 41 fabrication, layout, setting or erection details. The drawings shall be <br /> 42 prepared by a qualified detailer and shall identify details by reference to <br /> 43 sheet and detail numbers shown on the drawings, applicable specification <br /> � 44 or special provisions seclion, and bid item. <br /> ' 45 <br /> 46 Manufacturer's Standard Schematic Drawings <br /> 47 The Contractor shall modify the drawings to delete information which is not <br /> i 48 applicable to the project. The standard information shall be supplemented <br /> � 49 as needed to supply additional information applicable to the project. <br /> 50 <br /> 1 <br /> � Port ol Everett FAWAT•OY039 <br /> Satellite RaIIfBa�ge TransMi�Facility Final Port Review Draft <br /> i Phase 1:Pier Construction 6 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.