i <br /> , <br /> i1 Contractor's Responsibilities <br /> 2 The Contractor shall review shop drawings, pmduct information, and project <br /> ( 3 data before submission and verify field dimensions, constr��ction criteria, <br /> I 4 catalog numbers, and other data. The submittals shall be coordinatad with the <br /> 5 rsquirements of the Work and the contract documents. If there is a deviation <br /> i 6 from the requirements of the contrect documents, the submittal transmittal shail <br /> 7 ciearly indicate the deviation. See Special Provision SUBSTITUTIONS for <br /> 8 related information. <br /> � � <br /> I10 The Contractor is not relieved of responsibility for errors and omissions in <br /> 11 s�bmittals by the Engineer's review or approval of submittals. Furthermore the <br /> 12 Contractor is not relieved of responsibility for deviations from the requirements <br /> 13 of the contract documents due to the Engineer's review or approval of <br /> 14 submittals. <br /> 15 <br /> 16 The Conlractor shall not proceed with any work where submittals are required <br /> 17 until submittals are retumed with the Engineer's stamp and initials indicating <br /> 18 review and approval. <br /> I 19 <br /> 20 Color Selection <br /> 21 Tha Contractor shall submit to the Engineer or Architect all items that require <br /> 1 22 color selections at one time. This submittal shall be scheduled a minimum of <br /> 23 30 days before the reviewed submittals are needed by the Contractor to avoid <br /> 24 delays. The submittal for color selection shall include but is not limited to: <br /> , 25 sealants, plastic laminate, identifying devices, paints and stains, aluminum <br /> , 26 finishes, roofing, siding, and flooring. <br /> 27 <br /> 28 Schedule of Submittals <br /> 29 The Contractor shall submit a schedule of submittals using the Record of <br /> � 30 Material and coordinate it with the Project Construction Schedule. The <br /> 31 schedule shall designate review times in accordance with Section 1-05.3 or as <br /> ! 32 indicated otherwise in the Standard Specifications and Special Provisions. No <br /> 33 additional time will be considered for submittals that require resubmittal. <br /> 34 <br /> � 35 Working Drawings, Product Information and Project Data <br /> � 36 When working drawings, product information, and/or other project data are <br /> 37 required, the Contractor shall furnish as follows: <br /> � 38 <br /> � 39 Ori mal Drawin s <br /> i 9 9 <br /> 40 Original drawings shall illustrate some portions of the woric showing <br /> I 41 fabrication, layout, setting or erection details. The drawings shall be <br /> 42 prepared by a qualified detailer and shall identify details by reference to <br /> 43 sheet and detail numbers shown on the drawings, applicable specification <br /> � 44 or special provisions seclion, and bid item. <br /> ' 45 <br /> 46 Manufacturer's Standard Schematic Drawings <br /> 47 The Contractor shall modify the drawings to delete information which is not <br /> i 48 applicable to the project. The standard information shall be supplemented <br /> � 49 as needed to supply additional information applicable to the project. <br /> 50 <br /> 1 <br /> � Port ol Everett FAWAT•OY039 <br /> Satellite RaIIfBa�ge TransMi�Facility Final Port Review Draft <br /> i Phase 1:Pier Construction 6 15 March 2005 <br />