Laserfiche WebLink
i <br /> i <br /> i <br /> � 1 2. At a minimum, it shall describe the r�ature of the work to be performed, the <br /> 2 proposed approach and sequence, type of equipmenl to be usEd, locations of <br /> 3 cranes and barges, plans for demolition, debris control and disposal of materials, <br /> ; 4 temporary �.onstruction, compliance with environmental prowsions, and building <br /> 5 systems, methods for protection of passengers and terminal operations, any <br /> ' 6 unavoidable impacts and necessary safeguardslprecautions and mitigating <br /> i 7 measures. <br /> , 8 <br /> 9 3. The Work Pla� shall include the Contractors barge movement Flan for barge <br /> I 1 C related activities during the eelgrass growing season (March 21 - September 21). <br /> 11 The Work Plan must acknowledge where the Contractor's barge(s) will be during <br /> 12 the ��elgrass growing season. It shall also demonstrate the Contractor's method <br /> ; 13 of tracking the barge location and movement. <br /> 14 <br /> 15 4. The Work Plan shall include the Contractor's method of placing and retrieving <br /> { 16 anchors, and anchor cables, in a manner which wiil not cause damage or impact <br /> I 17 to the existing eelgrass beds. <br /> 18 <br /> i19 5. The Contractor shall submit a dzmolition and safety Plan with working drawings <br /> i 20 showing lhe method of removing portions of the exisling structure. <br /> 21 <br /> I 22 6. Work Plan should also include relevant information from the TESC Plan and the <br /> ! 23 public access requirements. <br /> ' , 1 <br /> � ,'_5 7. Approved Work Pians shall be updated whenever conditions change or as <br /> i 26 directed by the Engineer. <br /> 27 <br /> 28 Work shall not commence until approval of the Work Plan is given in writing by the <br /> ' 29 Engineer. <br /> � 3.• <br /> ( 31 SUBMI7TALS <br /> 32 General <br /> I 33 This Special Provision supplements Se:.tion 1-05.3 "Plans and Working Urawings" and <br /> 34 Section 1-06.1 "Approval of Ma �rials Prior to Use" of the Standard Specifications. <br /> 35 <br /> � 36 Submittal Requirements <br /> 37 <br /> 38 Record of Material <br /> � 3g The Engineer will prepare a Record of Materiai listing the required submittals, <br /> 40 submittal type, submittal identificalion, applicable bid item, and other pertinent <br /> 41 information and transmit it to the Contractor at the pre-construction conference. <br /> I 42 The Record of Material is provided as a convenience to the Contractor and may <br /> 43 be used by the Contractor to prepare submittals and the submittal schedule. <br /> 44 The Record o( Material is provided to facilitate the execution and administration <br /> 45 of the contract. It does not alter the Contract and thus may be revised during <br /> � 4G the course of the project to include all contracl requirements concerning <br /> 47 submittals and approvals. The Record of Material shall not relieve the <br /> 48 Contractor of any risks or obligations under the contract. <br /> I Port of Everett FAWAT-OY079 <br /> Satellite RaillBarge Transfer Facility Final Port Review Dra1t <br /> � Phase 1:Pier Construction 5 15 March 2005 <br />