My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> ( 1 Manufacturer's Catalog Sheets, Brochures, Dixgrams, Schedules, <br /> 2 Performance Charts, lilustrations and other Standard Descriptive <br /> � 3 Information <br /> 4 The Contractor shall clearly mark each copy to identify pertinent materials, <br /> 5 products or models and reference the applicable bid item and specification <br /> i 6 section. The submittal shall ciearly show dimensions and clearances <br /> 7 required, perfortnance characteristics and capacities, wiring diagrams and <br /> 8 controls, and other pertinent information. <br /> I 9 <br /> 10 Samples <br /> 11 When samples are required, the Contractor shall furnish the following: <br /> 12 <br /> ) 13 1. Physical examples to illustrate materials, equipment, or workmanship, <br /> � 14 and to establish standards by which completed work is judged. <br /> 15 2. Office samples, of sufficient size and quantity, to ctearly illustrate the <br /> ` 16 functional characteristics of product or material with integrally related <br /> � 17 parts and attachment devices and the full range of color samples. <br /> 18 3. Field samples and mock-ups erected at the project site at a location <br /> I 19 acceptable to the Engineer. Each sample or mock-up shall be <br /> 20 completely finished using all trades involved in the final work. <br /> 21 <br /> � 22 Record Drawings and Operation and Maintenance Manuals <br /> 23 As-built plans and operation and maintenance manuals shall be prepared in <br /> 24 conformance with the Special Provisions ASBUILT/RECORD DRAWINGS and <br /> � 25 OPERATION AND MAINTENANCE MANUAL.S. <br /> 26 <br /> 27 Submission Requirements <br /> 28 Submirials are required for products and services noted in each specification <br /> � 29 Section, Special Provision and identified on the Plans. Submit each section's <br /> � 30 submittal complete at one time. Incomplete or p�ecemeal submittals will be <br /> 31 returned without action. <br /> ( 32 <br /> 33 Unless more copies are required by the Standard Specification or Special <br /> 34 Provisions, the Contractor shall submit seven (7) copies of sf op drawings, <br /> � 35 product information and project data to the Engineer for approval. Three (3) <br /> , 36 physical samples shali be submitted unless otherwise required by the Standard <br /> 37 Specifications or Special Provisions. <br /> � 3A <br /> :,9 All material, equipment and product submittals shall be submitted using the <br /> �0 Qualified Product List (QPL) procedure for products from the Qualified Product <br /> � 41 List or the Request for Approval of Material (RAM) procedure as specified in <br /> 42 section 1-06.1 oi the Standard Specificalions. <br /> 43 <br /> 44 All submitlals shall be accompanied by a cover letter signed by the Contractor <br /> ` 45 stating that the submittal has been reviewed, verified and coordinated as <br /> � 46 described in paragraph Contractor's Responsibilities of this Special <br /> 47 Provision, and that it complies with the requirements of the contract documents. <br /> i 48 Any deviations from the project requirements shall be noted in this cover letter. <br /> 49 <br /> f <br /> � <br /> � Port of EvereN FAWAT-03-039 <br /> Satellite RaIIIBarge Transfer Facility Final Port Review DraR <br /> � Phase 1:Pier Construction 7 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.