My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 All submittals shall include the following basic information: <br /> 2 <br /> 3 1. Date and revision dates <br /> � 4 2. Project title and contract number <br /> 5 3. Specification t�tl2 and section number <br /> , 6 4. Names of the contractor. subcontractor, supplier, fabricator, andlor <br /> i 7 manufacturer. <br /> ' 8 5. Identification of product or materi�l. <br /> 9 ei. Clearly identified field dimensions. <br /> � 10 7. Applicable standards sucli as A/�SHTO or ASTM number or Federal <br /> 11 specification. <br /> 12 8. Deviations from contract documents clearly indicated. <br /> i 13 9. Bid item number. <br /> ( 14 10. Submittals required per the Technical Provisions (Appendix B) shall be <br /> 15 identified by the Specification Section number (i.e. "Submittal 05500- <br /> � 16 01", "Submittal 05500-02", etc) <br /> � 17 <br /> 18 Resubmission Requirements <br /> I 19 The contractor �hall revise andlor supplement the initial submittal as required <br /> f 20 and clearly indicate the changes made. The resubmittal shall be resubmitted <br /> � 21 as specified for an inilial submittal. <br /> � 22 <br /> 23 <br /> 24 SUBSTITUTIONS <br /> � 25 General Requirements <br /> 26 Any reference in the Contrar,t Plans or Provisions to any article, device, produc?, <br /> 27 material, fixture, form or type of construction by name, make, or cataloa number shall be <br /> i28 interpreted as establishing a standard of quality and shall not be construed as limiting <br /> 29 competition unless specifically stated "no exceptions" or "no substitutions". VJhere a <br /> 30 partir,ular component of a mechanical and/or electrical systems is specified by a <br /> I 31 manufacturer's name and part number herein or on lhe Plans, it is so specified to <br /> 32 establish quality, performance, capacity, fit-up, configuration, and arrangement of parts. <br /> 33 <br /> � 34 An equivaient item made by another manufacturer may be substituted for the specified <br /> { 35 item, subject to approval by the Engineer in writing, except where "no substitutions" or <br /> 36 "no exceptions" is stated. <br /> 37 <br /> i 38 Substitution Request <br /> 39 The Contractor shall submit a written request for proposed substitutions in accordance <br /> � 40 with requiremenls of Speciai Provision SUBMITTALS and Section 1-05.3 of the Standard <br /> 41 Specifications. <br /> � 42 <br /> � 43 Each submittal shall include the following information: <br /> 44 1. Complete data on the proposed sub�''tution. <br /> 45 a. Producl identification, including manufacturer's name and address. <br /> 46 b. Manufacturer's literature including complete catalog data, physical and <br /> i47 technical data, wiring diagrams, schematics, performance and test data, <br /> 48 reference standards and any other descriptive data as required by the <br /> 49 Engineer to determine equality. <br /> ( <br /> Port of Everett FAWAT-0}039 <br /> Satellite RaillBargo Transier Facility Final Port Review Drafl <br /> � Phase 1:Pier Consiruction 8 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.