Laserfiche WebLink
1 <br /> f1 c. Name and address of similar projects on which product was used and date <br /> 2 of installation. <br /> 3 2. Stamped engineering analysis and calculations, if necessary to demonstrate <br /> � 4 equality, and as requested by the Engineer. All engineering necessary to <br /> 5 incorporate the substitution into the project, including engineering which may <br /> I 6 be necessary to verify the adequacy and interchangeability of lhe substitution, <br /> 7 shall be included in the submittal of the substitution. <br /> 8 3. Itemized comparison of the proposed substitution with product or method <br /> 9 specified, if requested by the Engineer. <br /> � i0 4. Data relating to changes in construction schedule, if the substitution will impact <br /> ` 11 schedule. <br /> 12 <br /> I 13 In addition, each submittai shall include confirmation o(the following: <br /> 14 1. The substitution shall meet or exceed the quality and criteria of the product <br /> 15 specified on the project plans and specifications. <br /> i 16 2. The substitution shall be functionally and, in the case of inechanical or <br /> I 17 electrical components, physically interchangeable with the specified part. <br /> 18 3. The substitution shall of the same quality, performance, mounting configuration, <br /> � 19 envelope dimensions, and mechanical and electrical configuration as the <br /> 20 specified part. <br /> 21 <br /> i 2:: Substitutions will not be permitted if the substitution will require substantial revision of <br /> 23 the contract. The Contractor shall bear all risk and all costs of any work delays caused <br /> 24 ;�y non-approval of a substitulion request. <br /> � 25 <br /> 26 In makirig Request for Substitution, the ManufacturerlContractor Represents: <br /> 27 1. They have personally investigated the proposed product and determined that it <br /> 28 is equal or superior in all respects to that specified. <br /> R 29 2. All claims (or fulure addilional costs by the Manufacturer/Contractor related to <br /> 30 the substilution will be waived. <br /> 31 <br /> � 32 <br /> 33 AS-BUILT/RECORD DRAWINGS <br /> 34 <br /> ( 35 Description <br /> 36 The Contractor shali submit record drawings identifying ali differences between the <br /> 37 installed conditions and those indicated in the Contract Documents. <br /> I 38 <br /> 39 The Contractor shall submit new information not snown in the Contract Documents but <br /> 40 listed below. <br /> � 41 <br /> 42 Materials <br /> 43 The Contracting Agency will furnish the one set of 11-inch by 17-inch contract plans on a <br /> 4 44 heavy bond paper for record drawing submittals. The Contractor shall indicate as-built <br /> 45 information on these drawings. <br /> 46 <br /> � 47 New in(ormation not shown in the Contract Plans shall be submitted on 11-inch by 17- <br /> 48 inch sheets of vellum, t�iylar, or heavy bond. <br /> 49 <br /> IPort ol Everott FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facility Final Port Review Draft <br /> �. Phase 1:Pier Construclion 9 15 March 20D5 <br />