My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> f1 c. Name and address of similar projects on which product was used and date <br /> 2 of installation. <br /> 3 2. Stamped engineering analysis and calculations, if necessary to demonstrate <br /> � 4 equality, and as requested by the Engineer. All engineering necessary to <br /> 5 incorporate the substitution into the project, including engineering which may <br /> I 6 be necessary to verify the adequacy and interchangeability of lhe substitution, <br /> 7 shall be included in the submittal of the substitution. <br /> 8 3. Itemized comparison of the proposed substitution with product or method <br /> 9 specified, if requested by the Engineer. <br /> � i0 4. Data relating to changes in construction schedule, if the substitution will impact <br /> ` 11 schedule. <br /> 12 <br /> I 13 In addition, each submittai shall include confirmation o(the following: <br /> 14 1. The substitution shall meet or exceed the quality and criteria of the product <br /> 15 specified on the project plans and specifications. <br /> i 16 2. The substitution shall be functionally and, in the case of inechanical or <br /> I 17 electrical components, physically interchangeable with the specified part. <br /> 18 3. The substitution shall of the same quality, performance, mounting configuration, <br /> � 19 envelope dimensions, and mechanical and electrical configuration as the <br /> 20 specified part. <br /> 21 <br /> i 2:: Substitutions will not be permitted if the substitution will require substantial revision of <br /> 23 the contract. The Contractor shall bear all risk and all costs of any work delays caused <br /> 24 ;�y non-approval of a substitulion request. <br /> � 25 <br /> 26 In makirig Request for Substitution, the ManufacturerlContractor Represents: <br /> 27 1. They have personally investigated the proposed product and determined that it <br /> 28 is equal or superior in all respects to that specified. <br /> R 29 2. All claims (or fulure addilional costs by the Manufacturer/Contractor related to <br /> 30 the substilution will be waived. <br /> 31 <br /> � 32 <br /> 33 AS-BUILT/RECORD DRAWINGS <br /> 34 <br /> ( 35 Description <br /> 36 The Contractor shali submit record drawings identifying ali differences between the <br /> 37 installed conditions and those indicated in the Contract Documents. <br /> I 38 <br /> 39 The Contractor shall submit new information not snown in the Contract Documents but <br /> 40 listed below. <br /> � 41 <br /> 42 Materials <br /> 43 The Contracting Agency will furnish the one set of 11-inch by 17-inch contract plans on a <br /> 4 44 heavy bond paper for record drawing submittals. The Contractor shall indicate as-built <br /> 45 information on these drawings. <br /> 46 <br /> � 47 New in(ormation not shown in the Contract Plans shall be submitted on 11-inch by 17- <br /> 48 inch sheets of vellum, t�iylar, or heavy bond. <br /> 49 <br /> IPort ol Everott FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facility Final Port Review Draft <br /> �. Phase 1:Pier Construclion 9 15 March 20D5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.