My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 Submittals <br /> 2 The Contractor shall note as-built information on the record drawings concurrent with <br /> � 3 construction. The Contractor shall make record drawings available to lhe Contracting <br /> 4 Agency for informal review on a monthly basis. The Contracting Agency will conduct <br /> 5 their informal review between the 20th and last day of each month, and prior to <br /> r 6 determining partiat payments. During the ini�rmal review, the Contractor shall fully <br /> I 7 cooperate with the Contracting Agency. <br /> 8 <br /> � 9 Within twenty days after Substantial Completion, the Contractor shall submit two final <br /> 10 draft hardcopies of the record drawings for approval. The Enyineer will not conduct the <br /> 11 final inspection per Section 1-05.11 prior to receiving this submittal. The record drawings <br /> 12 will be utilized by the Engineer in conducting the final inspection. Within 15 days <br /> I 13 following the finel inspection, the Engineer will either retum one copy of the record <br /> 14 drawings to the Contractor for revision and resubmittal or indicate acceptance of the <br /> 15 submittal by providing the Coniractor with written notification of the Completion Date of <br /> f 16 the contract granted all of the requirements for Section 1-08.5 are met. Upon final <br /> I 17 acceptance of the record drawings, the Contrar.tor shall submit the original reproducible <br /> 18 record drawings. <br /> ( 19 <br /> 20 The Contractor shsll also include a set of approved record drawings in manuals as <br /> 21 required in OPERATION AND MAINTENANCE MANUALS. <br /> � 22 <br /> 23 Construction Requirements <br /> 24 Record drawings shall be maintained on site and kept current with construction <br /> � 25 progress. These plans shall be used solely for the purpose of noting as-built <br /> 26 information. <br /> 27 <br /> 28 Record drawings shali identi(y ali plan revisions and their respective request for <br /> � 29 infcrmation number(RFI No.)or approved change order number, if applicable. <br /> 30 <br /> 31 Drawings should reflect the same degree of detail as the original plan drawings. <br /> 32 <br /> 33 Revisions are to be made by lining out features that were changed during construction <br /> 34 and then correcting them. These revisions are to be piaced onto the plans in a manner <br /> � 35 that results in neat and legible sheets. A red pen that writes sharp, clear, and dark with a <br /> � 3G medium line shall be used to make thc se notations. <br /> 37 <br /> � 38 All revisions shall be bubbled for easy recognition with re �ision number in a triangle and <br /> � 39 marked in the tiUe block. <br /> 40 <br /> 41 The Contractor shall use USAS Y14.15 Electrical and Electronics Diagrams and ANSI <br /> 42 Y14.5 Dimensioning and Tolerancing for electrical drafting standards. <br /> 43 <br /> 44 As-built and new information shall include but nol be limited to the following: <br /> � 45 <br /> ' 46 • Difference in configuration and fit up of hardware based on information in the <br /> 47 drawings. <br /> � 48 <br /> � 49 • Difference in size and location of reinforcing structural steei. <br /> 50 <br /> I <br /> ( <br /> Port o(Everett FAWAT-03A99 <br /> Satellite RaillBarge Transfer Facility Final Port Review DraYl <br /> Phase 1:Pler Conslruction tU 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.