Laserfiche WebLink
I <br /> I 1 Submittals <br /> 2 The Contractor shall note as-built information on the record drawings concurrent with <br /> � 3 construction. The Contractor shall make record drawings available to lhe Contracting <br /> 4 Agency for informal review on a monthly basis. The Contracting Agency will conduct <br /> 5 their informal review between the 20th and last day of each month, and prior to <br /> r 6 determining partiat payments. During the ini�rmal review, the Contractor shall fully <br /> I 7 cooperate with the Contracting Agency. <br /> 8 <br /> � 9 Within twenty days after Substantial Completion, the Contractor shall submit two final <br /> 10 draft hardcopies of the record drawings for approval. The Enyineer will not conduct the <br /> 11 final inspection per Section 1-05.11 prior to receiving this submittal. The record drawings <br /> 12 will be utilized by the Engineer in conducting the final inspection. Within 15 days <br /> I 13 following the finel inspection, the Engineer will either retum one copy of the record <br /> 14 drawings to the Contractor for revision and resubmittal or indicate acceptance of the <br /> 15 submittal by providing the Coniractor with written notification of the Completion Date of <br /> f 16 the contract granted all of the requirements for Section 1-08.5 are met. Upon final <br /> I 17 acceptance of the record drawings, the Contrar.tor shall submit the original reproducible <br /> 18 record drawings. <br /> ( 19 <br /> 20 The Contractor shsll also include a set of approved record drawings in manuals as <br /> 21 required in OPERATION AND MAINTENANCE MANUALS. <br /> � 22 <br /> 23 Construction Requirements <br /> 24 Record drawings shall be maintained on site and kept current with construction <br /> � 25 progress. These plans shall be used solely for the purpose of noting as-built <br /> 26 information. <br /> 27 <br /> 28 Record drawings shali identi(y ali plan revisions and their respective request for <br /> � 29 infcrmation number(RFI No.)or approved change order number, if applicable. <br /> 30 <br /> 31 Drawings should reflect the same degree of detail as the original plan drawings. <br /> 32 <br /> 33 Revisions are to be made by lining out features that were changed during construction <br /> 34 and then correcting them. These revisions are to be piaced onto the plans in a manner <br /> � 35 that results in neat and legible sheets. A red pen that writes sharp, clear, and dark with a <br /> � 3G medium line shall be used to make thc se notations. <br /> 37 <br /> � 38 All revisions shall be bubbled for easy recognition with re �ision number in a triangle and <br /> � 39 marked in the tiUe block. <br /> 40 <br /> 41 The Contractor shall use USAS Y14.15 Electrical and Electronics Diagrams and ANSI <br /> 42 Y14.5 Dimensioning and Tolerancing for electrical drafting standards. <br /> 43 <br /> 44 As-built and new information shall include but nol be limited to the following: <br /> � 45 <br /> ' 46 • Difference in configuration and fit up of hardware based on information in the <br /> 47 drawings. <br /> � 48 <br /> � 49 • Difference in size and location of reinforcing structural steei. <br /> 50 <br /> I <br /> ( <br /> Port o(Everett FAWAT-03A99 <br /> Satellite RaillBarge Transfer Facility Final Port Review DraYl <br /> Phase 1:Pler Conslruction tU 15 March 2005 <br />