Laserfiche WebLink
i <br /> � <br /> i1 • Final surveyed as-built locations of work points, diagonal measurements, and any <br /> 2 char.ges greater than 1/4 inch in the dimensions of the structures. <br /> i 3 <br /> � 4 • Location and/or routing of all permanent mechanical and electrical items design- <br /> 5 built by the Contractor. Dimensioning shall be relative to visible permanent <br /> tr 6 structures. <br /> 1 � <br /> 8 • Mechanical drawings shall include final pump and valve settings. <br /> � 9 <br /> 10 • Electrical drawings shall include: control circuit schematic, control drawings, <br /> 11 wiring and interconnect drawings; and any equipment dip switch or iumper � <br /> � 12 settings. <br /> 13 <br /> 14 • Dimensions of conduit and piping runs installed. <br /> 15 <br /> I 16 Payment <br /> { 17 The Contractor agrees to authorize ihe Engineer to deduct 5% of partial payment monies <br /> 18 due to the Contractor when record drawings are not kept concurrent with construction <br /> I 19 progress. Payment will be withheld until the final record drawings have been fumished <br /> 20 to the Engineer and approved. � <br /> 21 I j 22 Monies due for mobilization shall be paid in full and not be included in the deduction <br /> ( 23 calculations. <br /> 24 <br /> ( 25 <br /> 26 OPERATION AND MAINTENANCE MANUALS <br /> 27 Description � <br /> � 28 The Contractor shall prepare and submit Operation 8 Maintenance (O&M) manuals for <br /> , <br /> 29 all systems associaled with this project. O&M manuals shall include full size shop <br /> � 30 drawings with all as-buiit informalion and corrections included in the final set, full size As- <br /> 31 Built engineering drawings, manufacturers' data sheets for all equipment supplied, <br /> 32 equipment warranty information, operating and maintenance instructions, full size <br /> 33 schematics, cleaning and lubrication instructions, ali test data, testing procedures, <br /> 34 replacemenl part lists, and equipment nameplate data for all equipment and systems � <br /> 35 installed under this project. <br /> 36 <br /> 37 Requirements <br /> 3� Specifically, the Contractor shali provide the following information in the O&M manuals: <br /> 39 <br /> ( 40 1. Full size as-built engineering drawings for all worlc completed on the <br /> � 41 project. <br /> 42 2. Full size shop drawings corrected per the Port's comments during review <br /> ; f 43 and approval for all work completed on the pruject. <br /> f 44 3. Schematics, Wiring Diagrams, Console and Cabinet Assemblies as <br /> 45 applicable to the control system. These shall be updated to the "As- <br /> � 46 BuiIP' condition upon completion of Performance Acceptance Testing. 1 <br /> 47 4. Manufacturer's catalog data sheets (with specific part numbers clearly <br /> a8 indicated) and ali device data highlighted or otherwise indicated for all <br /> � 49 pumps, valves, filters, cylinders, sensors, limit switches, and ali other �� <br /> Port of Everett FAWAT-03-039 <br /> Satellite Rai118arge Transfer Facility Final Porl Review Draft <br /> IPhase 1:Pier Construction 11 15 March 2005 <br />