My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> i1 • Final surveyed as-built locations of work points, diagonal measurements, and any <br /> 2 char.ges greater than 1/4 inch in the dimensions of the structures. <br /> i 3 <br /> � 4 • Location and/or routing of all permanent mechanical and electrical items design- <br /> 5 built by the Contractor. Dimensioning shall be relative to visible permanent <br /> tr 6 structures. <br /> 1 � <br /> 8 • Mechanical drawings shall include final pump and valve settings. <br /> � 9 <br /> 10 • Electrical drawings shall include: control circuit schematic, control drawings, <br /> 11 wiring and interconnect drawings; and any equipment dip switch or iumper � <br /> � 12 settings. <br /> 13 <br /> 14 • Dimensions of conduit and piping runs installed. <br /> 15 <br /> I 16 Payment <br /> { 17 The Contractor agrees to authorize ihe Engineer to deduct 5% of partial payment monies <br /> 18 due to the Contractor when record drawings are not kept concurrent with construction <br /> I 19 progress. Payment will be withheld until the final record drawings have been fumished <br /> 20 to the Engineer and approved. � <br /> 21 I j 22 Monies due for mobilization shall be paid in full and not be included in the deduction <br /> ( 23 calculations. <br /> 24 <br /> ( 25 <br /> 26 OPERATION AND MAINTENANCE MANUALS <br /> 27 Description � <br /> � 28 The Contractor shall prepare and submit Operation 8 Maintenance (O&M) manuals for <br /> , <br /> 29 all systems associaled with this project. O&M manuals shall include full size shop <br /> � 30 drawings with all as-buiit informalion and corrections included in the final set, full size As- <br /> 31 Built engineering drawings, manufacturers' data sheets for all equipment supplied, <br /> 32 equipment warranty information, operating and maintenance instructions, full size <br /> 33 schematics, cleaning and lubrication instructions, ali test data, testing procedures, <br /> 34 replacemenl part lists, and equipment nameplate data for all equipment and systems � <br /> 35 installed under this project. <br /> 36 <br /> 37 Requirements <br /> 3� Specifically, the Contractor shali provide the following information in the O&M manuals: <br /> 39 <br /> ( 40 1. Full size as-built engineering drawings for all worlc completed on the <br /> � 41 project. <br /> 42 2. Full size shop drawings corrected per the Port's comments during review <br /> ; f 43 and approval for all work completed on the pruject. <br /> f 44 3. Schematics, Wiring Diagrams, Console and Cabinet Assemblies as <br /> 45 applicable to the control system. These shall be updated to the "As- <br /> � 46 BuiIP' condition upon completion of Performance Acceptance Testing. 1 <br /> 47 4. Manufacturer's catalog data sheets (with specific part numbers clearly <br /> a8 indicated) and ali device data highlighted or otherwise indicated for all <br /> � 49 pumps, valves, filters, cylinders, sensors, limit switches, and ali other �� <br /> Port of Everett FAWAT-03-039 <br /> Satellite Rai118arge Transfer Facility Final Porl Review Draft <br /> IPhase 1:Pier Construction 11 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.