Laserfiche WebLink
� <br /> � 1 control, electrical and hydrauiic components. Include installation, <br /> 2 inspection, and maintenance information. <br /> � 3 5. Copies of Test Procedures and results used to "prove" the system as <br /> � 4 required in the contract Special Provisions. <br /> 5 6. Copies of all material certifications and test results required in the <br /> � 6 contract Special Provisions. <br /> 7 7. Purr,hased equipment warranty certificates. <br /> 8 8. Manufacturer's recommended operations and maintenance instructions. <br /> � 9 9. Man�facturer's recommended spare parts list. <br /> 10 10. Equipment nameplate dala. <br /> 11 <br /> 12 U&M manuais shall be submitted to the Engineer for review after completion of the <br /> � 13 Perfortnance Acceptance Tests. Allow 30 days for the engineer to approve this / these <br /> 14 08M manual submittal(s). <br /> 15 <br /> � 16 Materials <br /> 17 O&M Manuals shall be bound using standard 12.5 gauge vinyl 8 1/2" x 11", white, <br /> 18 maximum 3" spine width, three-ring binders. Binders shall have 9 gauge plastic overlay <br /> I 19 allowing insertion of cover and spine sheet. <br /> 20 <br /> 21 Typed pages shall be on 8 1/2" x 11" white sheets of 20 Ib. Minimum paper using a <br /> 22 minimum 12 point font. <br /> � 23 <br /> � 24 Each O&M manual's section shall be separated with pre-printed, numerical dividers. <br /> � 25 The table of contents shall be preceded by a computer printed divider titled: Table of <br /> 26 Contenis. <br /> 27 <br /> 28 Drawings shall have a reinforced punched binder tab and be hound with the text. Larger <br /> � 29 drawings shall be folded to the size of the text pages or inserted in clear plastic folders. <br /> � 30 The face of these folders shall be labeled with the drawing's title. <br /> 31 <br /> j 32 Material produced by a supplier or vendor shail be an original or first generation copy. <br /> l 33 <br /> 34 General Requirements <br /> i 35 Each binder shall include a typewritten general table of contents listing the systems <br /> 36 covered and respective volume when multiple binders are used. <br /> 37 <br /> � 38 When multiple volumes are necessary, correlate the data into common areas of interest. <br /> 39 <br /> 40 Label each binder's binding and cover with the (ollowing: POE Rail/Barge Transfer <br /> � 41 Facility, OPERATION AND MAINTENANCE MANUAL, Discipline, Systems included in <br /> 42 the binder, dale, and volume when necessary. <br /> 43 <br /> I 44 Separate differing systems ar.d ;heir subdivisions within binders by using staggered <br /> 45 index tabs. Labei each index tab with a typed title of the system or subdivision. <br /> 46 <br /> 47 Unless otherwise specified, each system section shall be subdivided into the following <br /> � 48 subjects as a minimum (where applicable) and in the following order: <br /> 49 <br /> � Port oi Everetl FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facility Final Port Revlew Drott <br /> iPhase 1:Pier Constructlon 12 15 March 2005 <br />