My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> I 1 Table of Contents: <br /> 2 • Each system shall have its own table of contents broken down into its <br /> I 3 subdivisions. <br /> 4 a <br /> 5 Generallnformation: <br /> � 6 • The name of the Contractor(s) responsible for installing the system, the <br /> 7 name of the responsible principal of each respective firm, the firm(s)' <br /> 8 address and business telephone number. <br /> 9 <br /> � 10 System averview: <br /> 11 • Normai operating characteristics and limiting conditions. <br /> I 12 <br /> 13 Diagrammatic equipment arcangement <br /> 14 <br /> � 15 Product data for each system cornponent: <br /> 16 • Catalog number <br /> 17 • Catalog cuts and manufacturing data size <br /> � 18 • Complete reordering information <br /> � 19 • Specific designations of colors and textures (architectural materials and <br /> 20 finishes only) <br /> � 21 • Composition (architectural materials and finishes oniy) <br /> 22 <br /> 23 Approved as-built drawings <br /> � 24 <br /> 25 Wiring and system schematic diagrams: <br /> 26 • 'Niring diagrams and schematics for each system installed under this <br /> � 27 contract shall be complete. "Typical" line diagrams will not be acceptable <br /> � 28 unless properly marked to indic�te the eaact field installation. <br /> 29 <br /> � 30 Ladder diagrams: <br /> 31 • Ladder diagrams for each relay based control system installed under this <br /> 32 contract. <br /> 33 • Final PLC program ladder diagrams for each PLC based control system <br /> I 34 installed u�der this contract. <br /> 35 <br /> 36 Installation instructions: <br /> ! 37 • Including manufacturer's speci(ic instructions included with various <br /> � 38 components. <br /> 39 <br /> I40 Instructions for care of materials and finishes: <br /> 41 • Instructions for maintenance and repair <br /> 42 • Manufacturer's recommendations for types oF clearing agents and methods <br /> I 43 of cleaning. <br /> 44 • Manufacturer's cautions against cleaning agents andlor cleaning methods <br /> 45 which are detrime�tal to product or finish. <br /> � 46 <br /> � 47 Operating instructions: <br /> 48 • Startup and break-in routine <br /> i <br /> � Port of Everett FAWAT-03-038 <br /> Satellite Rail/Barge Transfer Facility Flnal Port Ravlew Drak <br /> , Phase 7:Pler Constructlon 13 75 Maroh 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.