My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I1 • Instructions for regulation, control, stopping, shut down and emergency <br /> 2 operation. <br /> i 3 • Variation in normal operating instructions due lo seasonal (weather) <br /> � 4 conditions. <br /> 5 • Description of the sequence of operation with all interlocks, safeties, and <br /> I 6 responses to abnormalities and the as-installed control diagrams by the <br /> 7 control manufacturer. <br /> 8 <br /> 9 Maintenance instructions: <br /> � 10 • Routine maintenance procedures including equipment disassembly, repair, <br /> 11 reassembly, alignment, adji!stment, and checking. <br /> 12 • Recommended schedule for servicing and lubrication including a list of <br /> 13 lubricants required to perform the procedures. <br /> � 14 • Data on the prediclive life of parts subject to wear, items recommended to be <br /> � 15 stocked as spare parts and the quantity of each part. <br /> I 16 <br /> 17 Spare parts list: <br /> 18 • Parts lists shall give fuil ordering information assigned by the original parts <br /> ( 1g manufacturer. Re!abeled andlor renumbered parts information as <br /> 20 reassigned by equipmenl supplier are not acceptable. <br /> 21 • Item number <br /> � 22 • Price <br /> 23 • Availability <br /> 24 • Parts deemed as "recommended spares" and their anticipated usage over a <br /> j 25 two (2) year period. <br /> 1 zg . Local source or supplier <br /> 27 <br /> ! 28 Manufacturer's troubleshooting guide for common problems or <br /> � 2g Contractor's if a design-buil�l system <br /> 30 <br /> I 31 Equipment nameplate data: <br /> 3Z • Including model, serial and part numbers. <br /> 33 <br /> i 34 Pertonnance tests: <br /> 35 • Performance curves, engineering data and factory test perfomied. <br /> 36 <br /> � 37 Warranties and service contracts: <br /> ! 3g • Including contract name and address irformation. <br /> 39 <br /> j 40 Each type of electrical or mechanical device provided under this contract shall be <br /> • 41 identified in the O&M Manual using the same identification as shown on the Drawings or <br /> 42 in the Special Provisions. Tha information included must be the exact equipment <br /> ` 43 installed, not the complete line of the manufaclurer. Where data or instructional sheets <br /> � 44 show the equipment installed a�d other equipment, the uninstalled equipment shall be <br /> 45 neatly crossed out. <br /> 46 <br /> � Port of Everett FAWAT•03039 <br /> Satelllte RaillBarge Transter Facillty Final Port Review Draft <br /> � Phase 1:Pier Construclion 14 15 March 2005 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.