Laserfiche WebLink
i <br /> I1 Payment <br /> 2 There is no separate pay item for OPERATIOM AND MAINTENANCE MANUALS. All <br /> i 3 costs associated with OPERATION AND MAINTENANCE MANUALS shall be included <br /> � 4 in items of work involved in accordance with Section 1-04.1. <br /> 5 <br /> � 6 <br /> 7 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> � 8 State Taxes <br /> 9 Section 1-07.2 is supplemented with the following: <br /> 10 <br /> 11 The work on this contract is to be performed upon lands whose ownership obligates <br /> � 12 the Contractor to collect State sales tax from the Contracting Agency. The <br /> 13 provisions of Section 1-07.2(2)apply. <br /> 14 <br /> f 15 <br /> � 16 ENVIRONMENTAL PROVISIONS <br /> 17 Tlie Contractor shall comply with the following environmental provisions which are <br /> 18 included in these contract documents. <br /> 19 <br /> 20 If the Contraclor's operations involve work outside the area covered by the following <br /> i 21 environmental provisions, the Contractor shall consult with the Engineer and determine <br /> � 22 whether there are additional environmental provisions covering the area or work <br /> � 2's involved. <br /> 24 <br /> 25 Fish And Wildlife and Ecology Regulations <br /> ; 26 <br /> � 27 State Department of Fish And Wildlife <br /> 28 Section 1-07.5(2) is supplemented with the following: <br /> � 29 <br /> 30 The Contracting Agency has obtained a Hydraulic Project Approval (HPA) for <br /> 31 this project#xxxxxxxx and the Contractor shall comply with all provisions of this <br /> 32 approval. All contacts with the �epartment o( Fish And Wildlife conceming this <br /> � 33 approval shall be througli the Engineer. The provisions of the approvat are as <br /> 34 follows (XXXXXXXX: <br /> 35 <br /> I 36 <br /> 1 37 This Hydraulic Project Approval is not a permit for work in material sources or <br /> 38 disposal sites not provided in thE contract. <br /> I 39 <br /> 40 Work within the areas covered by this Hydraulic Project Approval shall be <br /> 41 performed before December 31, 2009. <br /> I 42 <br /> 43 <br /> � 44 <br /> � 45 <br /> � <br /> � <br /> I Port af Everett FAWAT-03-039 <br /> Salellite RaillBarge Transfer Facllity Final Port Review Draft <br /> IPhase 1:Pier Construc0on 15 15 Mareh 2005 <br />