My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I1 Payment <br /> 2 There is no separate pay item for OPERATIOM AND MAINTENANCE MANUALS. All <br /> i 3 costs associated with OPERATION AND MAINTENANCE MANUALS shall be included <br /> � 4 in items of work involved in accordance with Section 1-04.1. <br /> 5 <br /> � 6 <br /> 7 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> � 8 State Taxes <br /> 9 Section 1-07.2 is supplemented with the following: <br /> 10 <br /> 11 The work on this contract is to be performed upon lands whose ownership obligates <br /> � 12 the Contractor to collect State sales tax from the Contracting Agency. The <br /> 13 provisions of Section 1-07.2(2)apply. <br /> 14 <br /> f 15 <br /> � 16 ENVIRONMENTAL PROVISIONS <br /> 17 Tlie Contractor shall comply with the following environmental provisions which are <br /> 18 included in these contract documents. <br /> 19 <br /> 20 If the Contraclor's operations involve work outside the area covered by the following <br /> i 21 environmental provisions, the Contractor shall consult with the Engineer and determine <br /> � 22 whether there are additional environmental provisions covering the area or work <br /> � 2's involved. <br /> 24 <br /> 25 Fish And Wildlife and Ecology Regulations <br /> ; 26 <br /> � 27 State Department of Fish And Wildlife <br /> 28 Section 1-07.5(2) is supplemented with the following: <br /> � 29 <br /> 30 The Contracting Agency has obtained a Hydraulic Project Approval (HPA) for <br /> 31 this project#xxxxxxxx and the Contractor shall comply with all provisions of this <br /> 32 approval. All contacts with the �epartment o( Fish And Wildlife conceming this <br /> � 33 approval shall be througli the Engineer. The provisions of the approvat are as <br /> 34 follows (XXXXXXXX: <br /> 35 <br /> I 36 <br /> 1 37 This Hydraulic Project Approval is not a permit for work in material sources or <br /> 38 disposal sites not provided in thE contract. <br /> I 39 <br /> 40 Work within the areas covered by this Hydraulic Project Approval shall be <br /> 41 performed before December 31, 2009. <br /> I 42 <br /> 43 <br /> � 44 <br /> � 45 <br /> � <br /> � <br /> I Port af Everett FAWAT-03-039 <br /> Salellite RaillBarge Transfer Facllity Final Port Review Draft <br /> IPhase 1:Pier Construc0on 15 15 Mareh 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.