Laserfiche WebLink
i <br /> ! 1 EELGRASS ENCROACHMENT <br /> ; 2 The Contractor is advised that eelgrass beds are present at the project site and are <br /> I 3 protected under State and Federal law. The Contractor shall exercise extreme caution <br /> 4 when working in the area indicated on the Plans as Eelgrass Beds. The Contractor shall <br /> � 5 adhere to the restrictions listed in the Corps and HPA approvals included in these <br /> 6 Special Provisions during the life of the contract. <br /> 7 <br /> 8 Any fines or damage to eelgrass beds or subslrates supporting eelgrass beds that <br /> I9 results irom the Contractor's operations shall be paid or repaired at lhe Contractor's <br /> 10 expense. <br /> 11 <br /> ! 12 <br /> � 13 NOISE RESTRICTIONS <br /> j 14 The contractor shall assume that noise restrictions in Federal, State and local laws and <br /> � 15 regulations apply except for additional restrictions specifically indicated in Appendix E : <br /> 16 <br /> ' 17 <br /> 18 Washington State Department Of Ecology <br /> 19 <br /> I 20 The Department of Ecolo (Ecology) issued an Individual 401 Water Quality <br /> 21 Certification Order#�for this project, which is included in Appendix C <br /> � 22 <br /> , 23 Applicable Conditions of Order#-are included below: <br /> � 24 1. Possession Sound is a Class "AA" water of the state. Certification of this <br /> 25 proposai does not authorize the Applicant to exceed applicable state water <br /> ' 26 quality standards (173-201A WAC) or sediment quality standards (173-204 <br /> I 27 WAC). Water quality criteria contained in 173-201A-030(1) WAC and 173-201A- <br /> 28 040 WAC apply to this project. Furthermore, nothing in this certification shall <br /> 29 absolve the Applicant from liability for contamination and any subsequent <br /> I 30 cleanup of surface waters or sediments resulting from project constniction and/or <br /> 31 operations. <br /> 32 <br /> ( 33 2. The point of compliance for turbidity when working in marine waters shall be at a <br /> � 34 radius of one hundred fifty feet from the activity causing the turbidity exceedance. <br /> 35 The mixing zone is not granted for any other parameter other than turbiditv and is <br /> � 36 only authorized after the activity has received all other necessary local and state <br /> 37 permits and approvals, and afler the implementation of appropriated best <br /> 38 management practices to avoid or minimize disturbance of in-place sediments <br /> � 39 and exceedance of the turbidity criteria. <br /> 40 <br /> 41 3. This Order shall be valid during construction activities, through site stability and <br /> I 42 until the Corps of Engineers 404 permit expires. <br /> 43 <br /> 44 Any person who fails to comply with any provision of this Order shall be liable for a <br /> 45 penalty of up to ten thousand dollars ($10,000) per violation for each day of continuing n <br /> ' 46 <br /> Port of Everett FAWAT-03•039 <br /> Satellite RaillBarge Trensfer Facllity Final Port Revlew DraR <br /> � Phase 1:Pler Construction 16 75 March 2005 <br />