My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> f 1 Permits and Licenses <br /> 2 Section 1-07.6 is supplemented with the following: <br /> I 3 <br /> , 4 (March 13, 1995) <br /> 5 Corps Of Engineers Permits For Construction <br /> � 6 The Contracting Agency has obtained a Corps of Engineers permit for this project <br /> 7 (Permil Number "'—"'), which is included in Appendix C. All contacts with <br /> 8 the Corps of Engineers concern�ng this permit shall be through the Engineer. A <br /> � 9 copy of the permit is available at the Engineer's Office. The Contractor shall, at no <br /> 10 expense to the Contracting Agency, comply wilh all requirements of the Corps of <br /> ' 11 Engineers in the construction of this project and shall secure additional permits as <br /> � 12 are necessary. <br /> 13 <br /> 14 Wages <br /> 15 <br /> I16 ReFerence required wage rates and Appendix F. <br /> 17 <br /> 18 Contractor's Responsibility for Work <br /> ( 19 <br /> � 20 (August 6, 2001) <br /> 21 Repair of Damage <br /> I 22 Section 1-07.13(4) is revised to read: <br /> � 23 <br /> 24 The Contractor shall promptly repair all damage to either temporary or <br /> � 25 permanent work as directed by the Engineer. For damage qualifying for relief <br /> I 26 under Sections 1-07.13(1), 1-07.13(2) or 1-07.13(3), payment will be made in <br /> 27 accordance with Section 1-04.4. Payment will be limited to repair of damaged <br /> 28 work only. No payment will be made (or delay or disruption of work. <br /> 29 <br /> 30 ARCHAEOLOGICAL AND HISTORIC OBJECTS <br /> 31 The project area potentially contains cultural resources. At the discretion of the <br /> 32 Contracting Agency, the Contractor's operations will be monitored during �pland <br /> 33 earthwork and archaeological testing will be conducted at the Contracting Agency's <br /> � 34 expense. <br /> 35 <br /> 36 The Contractor may be required to conduct operations in a manner that will reserve <br /> 37 portions of the work area for testing and exploratory operations. <br /> 38 <br /> 39 Payment <br /> ! 40 Added work necessary to uncover, fence, dewater, or othenvise protect or assist in <br /> � 41 salvage as ordered by the Engineer shall be paid by force account under the item "Force <br /> 42 AccountArchaeology", as provided in Section 1-09.6 <br /> � 43 <br /> � 44 For the purpose of providing a common proposal for all bidders, and for that purpose <br /> 45 only, the Port has estimated the dollar amount for force account for this item and has <br /> � 4G arbitrarily entered the amount on the proposal form to become part of the tolal bid by the <br /> 47 Coniractor. <br /> 48 <br /> i <br /> � Port ot Everett FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facltity Final Port Review Draft <br /> Phase 1:Pier Constmction 17 75 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.